Solar power plant · Lamar, TX
Eiffel Solar Project
Eiffel Solar Project is a 240 MW solar power plant in Lamar County, Texas, operated by Paris Farm Solar, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 574 GWh, about what 43,000 average Texas homes use in a year.
Eiffel Solar Project in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 61st largest, about 0.6% of the state's 37 GW of solar capacity.
Lamar County has 9 power plants of 1 MW or more with 2.8 GW in all; Eiffel Solar Project is 8% of that and the 3rd largest of 7 solar plants there.
Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Lamar County goes 3.8 hours a year without power, the 213th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Eiffel Solar Project (outlined) and other plants in Lamar County, shaded. 33.599, -95.525.
Plant facts
- Operator
- Paris Farm Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Lamar County, TX
- EIA plant ID
- 66471
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| EIFEL | Solar Photovoltaic | 240 MW | 2023 | – |
Questions
Eiffel Solar Project, answered
How much power does Eiffel Solar Project produce?
Eiffel Solar Project has 240 MW of capacity from one generator. In 2025 it generated 574 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Eiffel Solar Project power?
Its 2025 output of 574 GWh equals the yearly electricity use of about 43,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Eiffel Solar Project?
Eiffel Solar Project is in Lamar County, Texas, at about 33.599°, -95.525°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Lamar County goes 3.8 hours a year without power, the 213th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Eiffel Solar Project?
It is operated by Paris Farm Solar, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Eiffel Solar Project open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.