Solar power plant · Lamar, TX

Tyson Nick

Tyson Nick is a 91 MW solar power plant in Lamar County, Texas, operated by Tyson Nick Solar Project, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 38 GWh, about what 2,800 average Texas homes use in a year.

Capacity91 MWNameplate, September 2026
Generated38 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Tyson Nick in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 150th largest, about 0.2% of the state's 37 GW of solar capacity.

Lamar County has 9 power plants of 1 MW or more with 2.8 GW in all; Tyson Nick is 3% of that and the 6th largest of 7 solar plants there.

The average electricity customer in Lamar County goes 3.8 hours a year without power, the 213th most of 240 counties in Texas. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Tyson Nick (outlined) and other plants in Lamar County, shaded. 33.645, -95.627.

Plant facts

Operator
Tyson Nick Solar Project, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Lamar County, TX
EIA plant ID
68856
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 91 MW 2025 –

Questions

Tyson Nick, answered

How much power does Tyson Nick produce?

Tyson Nick has 91 MW of capacity from one generator. In 2025 it generated 38 GWh.

How many homes does Tyson Nick power?

Its 2025 output of 38 GWh equals the yearly electricity use of about 2,800 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Tyson Nick?

Tyson Nick is in Lamar County, Texas, at about 33.645°, -95.627°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Lamar County goes 3.8 hours a year without power, the 213th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Tyson Nick?

It is operated by Tyson Nick Solar Project, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Tyson Nick open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.