Solar power plant · Lamar, TX
Mockingbird Solar Center
Mockingbird Solar Center is a 471 MW solar power plant in Lamar County, Texas, operated by Mockingbird Solar Center, LLC. Its oldest generator still running came online in 2024. In 2025 it generated 928 GWh, about what 70,000 average Texas homes use in a year.
Mockingbird Solar Center in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 12th largest, about 1.3% of the state's 37 GW of solar capacity.
Lamar County has 9 power plants of 1 MW or more with 2.8 GW in all; Mockingbird Solar Center is 17% of that and the largest of 7 solar plants there.
Its capacity factor of 23% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Lamar County goes 3.8 hours a year without power, the 213th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Mockingbird Solar Center (outlined) and other plants in Lamar County, shaded. 33.392, -95.425.
Plant facts
- Operator
- Mockingbird Solar Center, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Lamar County, TX
- EIA plant ID
- 64347
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 7777 | Solar Photovoltaic | 471 MW | 2024 | – |
Questions
Mockingbird Solar Center, answered
How much power does Mockingbird Solar Center produce?
Mockingbird Solar Center has 471 MW of capacity from one generator. In 2025 it generated 928 GWh, 23% of the most it could have made running flat out all year (its capacity factor).
How many homes does Mockingbird Solar Center power?
Its 2025 output of 928 GWh equals the yearly electricity use of about 70,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Mockingbird Solar Center?
Mockingbird Solar Center is in Lamar County, Texas, at about 33.392°, -95.425°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Lamar County goes 3.8 hours a year without power, the 213th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Mockingbird Solar Center?
It is operated by Mockingbird Solar Center, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Mockingbird Solar Center open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.