Wind power plant · San Patricio, TX

El Algodon Alto Wind Farm, LLC

El Algodon Alto Wind Farm, LLC is a 200 MW wind power plant in San Patricio County, Texas, operated by RWE Americas, LLC. Its oldest generator still running came online in 2022. In 2025 it generated 651 GWh, about what 49,000 average Texas homes use in a year.

Capacity200 MWNameplate, September 2026
Generated651 GWhIn 2025
Capacity factor37%Share of the most it could make, 2025
Generators1Oldest from 2022

El Algodon Alto Wind Farm, LLC in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 95th largest, about 0.4% of the state's 45 GW of wind capacity.

San Patricio County has 11 power plants of 1 MW or more with 2.4 GW in all; El Algodon Alto Wind Farm, LLC is 8% of that and the 2nd largest of 5 wind plants there.

Its capacity factor of 37% in 2025 is higher than the 32% typical for wind plants across the US.

The average electricity customer in San Patricio County goes 9.8 hours a year without power, the 118th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02004006008002022202320242025GWh 651
02004006008002022202320242025651

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

El Algodon Alto Wind Farm, LLC (outlined) and other plants in San Patricio County, shaded. 27.993, -97.744.

Plant facts

Operator
RWE Americas, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
San Patricio County, TX
EIA plant ID
64591
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
EEA Onshore Wind Turbine 200 MW 2022 –

Questions

El Algodon Alto Wind Farm, LLC, answered

How much power does El Algodon Alto Wind Farm, LLC produce?

El Algodon Alto Wind Farm, LLC has 200 MW of capacity from one generator. In 2025 it generated 651 GWh, 37% of the most it could have made running flat out all year (its capacity factor).

How many homes does El Algodon Alto Wind Farm, LLC power?

Its 2025 output of 651 GWh equals the yearly electricity use of about 49,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is El Algodon Alto Wind Farm, LLC?

El Algodon Alto Wind Farm, LLC is in San Patricio County, Texas, at about 27.993°, -97.744°. It is one of 11 power plants of 1 MW or more in the county. The average electricity customer in San Patricio County goes 9.8 hours a year without power, the 118th most of 240 counties in Texas. The county's page has the full outage record.

Who operates El Algodon Alto Wind Farm, LLC?

It is operated by RWE Americas, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did El Algodon Alto Wind Farm, LLC open?

Its oldest generator still running came online in 2022.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.