Solar power plant · San Patricio, TX

Peacock Energy Project

Peacock Energy Project is a 150 MW solar power plant in San Patricio County, Texas, operated by Lightsource Renewable Energy Asset Management, LLC. Its oldest generator still running came online in 2024. In 2025 it generated 307 GWh, about what 23,000 average Texas homes use in a year.

Capacity150 MWNameplate, September 2026
Generated307 GWhIn 2025
Capacity factor23%Share of the most it could make, 2025
Generators1Oldest from 2024

Peacock Energy Project in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 115th largest, about 0.4% of the state's 37 GW of solar capacity.

San Patricio County has 11 power plants of 1 MW or more with 2.4 GW in all; Peacock Energy Project is 6% of that.

Its capacity factor of 23% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in San Patricio County goes 9.8 hours a year without power, the 118th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040020242025GWh 307
010020030040020242025307

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Peacock Energy Project (outlined) and other plants in San Patricio County, shaded. 28.000, -97.388.

Plant facts

Operator
Lightsource Renewable Energy Asset Management, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
San Patricio County, TX
EIA plant ID
68474
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
TXPC1 Solar Photovoltaic 150 MW 2024 –

Questions

Peacock Energy Project, answered

How much power does Peacock Energy Project produce?

Peacock Energy Project has 150 MW of capacity from one generator. In 2025 it generated 307 GWh, 23% of the most it could have made running flat out all year (its capacity factor).

How many homes does Peacock Energy Project power?

Its 2025 output of 307 GWh equals the yearly electricity use of about 23,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Peacock Energy Project?

Peacock Energy Project is in San Patricio County, Texas, at about 28.000°, -97.388°. It is one of 11 power plants of 1 MW or more in the county. The average electricity customer in San Patricio County goes 9.8 hours a year without power, the 118th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Peacock Energy Project?

It is operated by Lightsource Renewable Energy Asset Management, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Peacock Energy Project open?

Its oldest generator still running came online in 2024.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.