Pintail BESS

Pintail BESS is a 200 MW storage power plant in San Patricio County, Texas, operated by Lydian Energy. Its oldest generator still running came online in 2026.

Capacity200 MWNameplate, September 2026
Net energy–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Pintail BESS in context

Among the 233 storage plants in Texas in the EIA's inventory, it is the 28th largest, about 1.2% of the state's 16 GW of storage capacity.

San Patricio County has 11 power plants of 1 MW or more with 2.4 GW in all; Pintail BESS is 8% of that and the largest of 3 storage plants there.

The average electricity customer in San Patricio County goes 9.8 hours a year without power, the 118th most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Pintail BESS (outlined) and other plants in San Patricio County, shaded. 28.043, -97.440.

Plant facts

Operator
Lydian Energy
Sector
IPP Non-CHP
Grid operator
ERCO
County
San Patricio County, TX
EIA plant ID
68582
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PPB Batteries 200 MW · 400 MWh 2026 –

Questions

Pintail BESS, answered

How much can Pintail BESS store and deliver?

Pintail BESS can deliver up to 200 MW and hold 400 MWh of energy, from one battery or storage system.

Where is Pintail BESS?

Pintail BESS is in San Patricio County, Texas, at about 28.043°, -97.440°. It is one of 11 power plants of 1 MW or more in the county. The average electricity customer in San Patricio County goes 9.8 hours a year without power, the 118th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Pintail BESS?

It is operated by Lydian Energy (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Pintail BESS open?

Its oldest generator still running came online in 2026.