Wind power plant · Carbon, WY
Foote Creek Rim
Foote Creek Rim is a 135 MW wind power plant in Carbon County, Wyoming, operated by PacifiCorp. Its oldest generator still running came online in 2024. In 2025 it generated 636 GWh, about what 63,000 average Wyoming homes use in a year.
Foote Creek Rim in context
Among the 28 wind plants in Wyoming in the EIA's inventory, it is the 13th largest, about 2.9% of the state's 4.7 GW of wind capacity.
Carbon County has 9 power plants of 1 MW or more with 1.8 GW in all; Foote Creek Rim is 7% of that and the 5th largest of 6 wind plants there.
Its capacity factor of 54% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Carbon County goes 3.0 hours a year without power, the 8th most of 20 counties in Wyoming. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Foote Creek Rim (outlined) and other plants in Carbon County, shaded. 41.628, -106.201.
Plant facts
- Operator
- PacifiCorp
- Sector
- Electric Utility
- Grid operator
- PACE
- County
- Carbon County, WY
- EIA plant ID
- 67916
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 135 MW | 2024 | – |
Nearby
Other plants in Carbon County
Questions
Foote Creek Rim, answered
How much power does Foote Creek Rim produce?
Foote Creek Rim has 135 MW of capacity from one generator. In 2025 it generated 636 GWh, 54% of the most it could have made running flat out all year (its capacity factor).
How many homes does Foote Creek Rim power?
Its 2025 output of 636 GWh equals the yearly electricity use of about 63,000 average Wyoming homes (835 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Foote Creek Rim?
Foote Creek Rim is in Carbon County, Wyoming, at about 41.628°, -106.201°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Carbon County goes 3.0 hours a year without power, the 8th most of 20 counties in Wyoming. The county's page has the full outage record.
Who operates Foote Creek Rim?
It is operated by PacifiCorp (EIA sector: Electric Utility), and it feeds PacifiCorp East.
When did Foote Creek Rim open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Wyoming home's 835 kWh a month in 2025. Methodology.