Hydro power plant · Carbon, WY

Seminoe

Seminoe is a 52 MW hydro power plant in Carbon County, Wyoming, operated by U S Bureau of Reclamation. Its oldest generator still running came online in 1939. In 2025 it generated 85 GWh, about what 8,400 average Wyoming homes use in a year.

Capacity52 MWNameplate, September 2026
Generated85 GWhIn 2025
Capacity factor19%Share of the most it could make, 2025
Generators3Oldest from 1939

Seminoe in context

Among the 16 hydro plants in Wyoming in the EIA's inventory, it is the 2nd largest, about 17% of the state's 303 MW of hydro capacity.

Carbon County has 9 power plants of 1 MW or more with 1.8 GW in all; Seminoe is 3% of that and the largest of 2 hydro plants there.

Its capacity factor of 19% in 2025 is lower than the 34% typical for hydro plants across the US.

The average electricity customer in Carbon County goes 3.0 hours a year without power, the 8th most of 20 counties in Wyoming. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020020182019202020212022202320242025GWh 85
050100150200201920212023202585

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Seminoe (outlined) and other plants in Carbon County, shaded. 42.156, -106.909.

Plant facts

Operator
U S Bureau of Reclamation
Sector
Electric Utility
Grid operator
WAUW
County
Carbon County, WY
EIA plant ID
4182
Where Wyoming's power comes from → Wyoming power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Conventional Hydroelectric 17 MW 1939 –
2 Conventional Hydroelectric 17 MW 1939 –
3 Conventional Hydroelectric 17 MW 1939 –

Questions

Seminoe, answered

How much power does Seminoe produce?

Seminoe has 52 MW of capacity from 3 generators. In 2025 it generated 85 GWh, 19% of the most it could have made running flat out all year (its capacity factor).

How many homes does Seminoe power?

Its 2025 output of 85 GWh equals the yearly electricity use of about 8,400 average Wyoming homes (835 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Seminoe?

Seminoe is in Carbon County, Wyoming, at about 42.156°, -106.909°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Carbon County goes 3.0 hours a year without power, the 8th most of 20 counties in Wyoming. The county's page has the full outage record.

Who operates Seminoe?

It is operated by U S Bureau of Reclamation (EIA sector: Electric Utility), and it feeds balancing authority WAUW.

When did Seminoe open?

Its oldest generator still running came online in 1939.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Wyoming home's 835 kWh a month in 2025. Methodology.