Solar power plant · Cochise, AZ

Fort Huachuca Solar PV Project

Fort Huachuca Solar PV Project is a 18 MW solar power plant in Cochise County, Arizona, operated by Tucson Electric Power Co. Its oldest generator still running came online in 2014. In 2025 it generated 35 GWh, about what 2,800 average Arizona homes use in a year.

Capacity18 MWNameplate, September 2026
Generated35 GWhIn 2025
Capacity factor22%Share of the most it could make, 2025
Generators2Oldest from 2014

Fort Huachuca Solar PV Project in context

Among the 109 solar plants in Arizona in the EIA's inventory, it is the 55th largest, about 0.2% of the state's 9.9 GW of solar capacity.

Cochise County has 10 power plants of 1 MW or more with 1.7 GW in all; Fort Huachuca Solar PV Project is 1% of that and the 5th largest of 5 solar plants there.

Its capacity factor of 22% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Cochise County goes 0.6 hours a year without power, the 11th most of 11 counties in Arizona. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0102030405020182019202020212022202320242025GWh 35
01020304050201920212023202535

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Fort Huachuca Solar PV Project (outlined) and other plants in Cochise County, shaded. 31.555, -110.350.

Plant facts

Operator
Tucson Electric Power Co
Sector
Electric Utility
Grid operator
TEPC
County
Cochise County, AZ
EIA plant ID
58972
Where Arizona's power comes from → Arizona power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
FHUAC Solar Photovoltaic 14 MW 2014 –
FHUA2 Solar Photovoltaic 4.1 MW 2017 –

Questions

Fort Huachuca Solar PV Project, answered

How much power does Fort Huachuca Solar PV Project produce?

Fort Huachuca Solar PV Project has 18 MW of capacity from 2 generators. In 2025 it generated 35 GWh, 22% of the most it could have made running flat out all year (its capacity factor).

How many homes does Fort Huachuca Solar PV Project power?

Its 2025 output of 35 GWh equals the yearly electricity use of about 2,800 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Fort Huachuca Solar PV Project?

Fort Huachuca Solar PV Project is in Cochise County, Arizona, at about 31.555°, -110.350°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Cochise County goes 0.6 hours a year without power, the 11th most of 11 counties in Arizona. The county's page has the full outage record.

Who operates Fort Huachuca Solar PV Project?

It is operated by Tucson Electric Power Co (EIA sector: Electric Utility), and it feeds balancing authority TEPC.

When did Fort Huachuca Solar PV Project open?

Its oldest generator still running came online in 2014.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.