Solar power plant · Cochise, AZ
Fort Huachuca Solar PV Project
Fort Huachuca Solar PV Project is a 18 MW solar power plant in Cochise County, Arizona, operated by Tucson Electric Power Co. Its oldest generator still running came online in 2014. In 2025 it generated 35 GWh, about what 2,800 average Arizona homes use in a year.
Fort Huachuca Solar PV Project in context
Among the 109 solar plants in Arizona in the EIA's inventory, it is the 55th largest, about 0.2% of the state's 9.9 GW of solar capacity.
Cochise County has 10 power plants of 1 MW or more with 1.7 GW in all; Fort Huachuca Solar PV Project is 1% of that and the 5th largest of 5 solar plants there.
Its capacity factor of 22% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Cochise County goes 0.6 hours a year without power, the 11th most of 11 counties in Arizona. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Fort Huachuca Solar PV Project (outlined) and other plants in Cochise County, shaded. 31.555, -110.350.
Plant facts
- Operator
- Tucson Electric Power Co
- Sector
- Electric Utility
- Grid operator
- TEPC
- County
- Cochise County, AZ
- EIA plant ID
- 58972
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| FHUAC | Solar Photovoltaic | 14 MW | 2014 | – |
| FHUA2 | Solar Photovoltaic | 4.1 MW | 2017 | – |
Questions
Fort Huachuca Solar PV Project, answered
How much power does Fort Huachuca Solar PV Project produce?
Fort Huachuca Solar PV Project has 18 MW of capacity from 2 generators. In 2025 it generated 35 GWh, 22% of the most it could have made running flat out all year (its capacity factor).
How many homes does Fort Huachuca Solar PV Project power?
Its 2025 output of 35 GWh equals the yearly electricity use of about 2,800 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Fort Huachuca Solar PV Project?
Fort Huachuca Solar PV Project is in Cochise County, Arizona, at about 31.555°, -110.350°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Cochise County goes 0.6 hours a year without power, the 11th most of 11 counties in Arizona. The county's page has the full outage record.
Who operates Fort Huachuca Solar PV Project?
It is operated by Tucson Electric Power Co (EIA sector: Electric Utility), and it feeds balancing authority TEPC.
When did Fort Huachuca Solar PV Project open?
Its oldest generator still running came online in 2014.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.