Solar power plant · Okeechobee, FL
FPL Cavendish Solar Energy Center
FPL Cavendish Solar Energy Center is a 75 MW solar power plant in Okeechobee County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2023. In 2025 it generated 116 GWh, about what 8,800 average Florida homes use in a year.
FPL Cavendish Solar Energy Center in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 100th largest, about 0.5% of the state's 14 GW of solar capacity.
Okeechobee County has 8 power plants of 1 MW or more with 2.2 GW in all; FPL Cavendish Solar Energy Center is 3% of that and the 4th largest of 7 solar plants there.
Its capacity factor of 18% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Okeechobee County goes 7.6 hours a year without power, the 37th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
FPL Cavendish Solar Energy Center (outlined) and other plants in Okeechobee County, shaded. 27.627, -80.804.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- Okeechobee County, FL
- EIA plant ID
- 65438
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 75 MW | 2023 | – |
Questions
FPL Cavendish Solar Energy Center, answered
How much power does FPL Cavendish Solar Energy Center produce?
FPL Cavendish Solar Energy Center has 75 MW of capacity from one generator. In 2025 it generated 116 GWh, 18% of the most it could have made running flat out all year (its capacity factor).
How many homes does FPL Cavendish Solar Energy Center power?
Its 2025 output of 116 GWh equals the yearly electricity use of about 8,800 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is FPL Cavendish Solar Energy Center?
FPL Cavendish Solar Energy Center is in Okeechobee County, Florida, at about 27.627°, -80.804°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Okeechobee County goes 7.6 hours a year without power, the 37th most of 67 counties in Florida. The county's page has the full outage record.
Who operates FPL Cavendish Solar Energy Center?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did FPL Cavendish Solar Energy Center open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.