Solar power plant · Okeechobee, FL
Lakeside Solar Center
Lakeside Solar Center is a 75 MW solar power plant in Okeechobee County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2020. In 2025 it generated 149 GWh, about what 11,000 average Florida homes use in a year.
Lakeside Solar Center in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 69th largest, about 0.5% of the state's 14 GW of solar capacity.
Okeechobee County has 8 power plants of 1 MW or more with 2.2 GW in all; Lakeside Solar Center is 3% of that and the 2nd largest of 7 solar plants there.
Its capacity factor of 23% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Okeechobee County goes 7.6 hours a year without power, the 37th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Lakeside Solar Center (outlined) and other plants in Okeechobee County, shaded. 27.214, -80.745.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- Okeechobee County, FL
- EIA plant ID
- 62922
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 75 MW | 2020 | – |
Questions
Lakeside Solar Center, answered
How much power does Lakeside Solar Center produce?
Lakeside Solar Center has 75 MW of capacity from one generator. In 2025 it generated 149 GWh, 23% of the most it could have made running flat out all year (its capacity factor).
How many homes does Lakeside Solar Center power?
Its 2025 output of 149 GWh equals the yearly electricity use of about 11,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Lakeside Solar Center?
Lakeside Solar Center is in Okeechobee County, Florida, at about 27.214°, -80.745°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Okeechobee County goes 7.6 hours a year without power, the 37th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Lakeside Solar Center?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did Lakeside Solar Center open?
Its oldest generator still running came online in 2020.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.