Solar power plant · Yakima, WA
Goose Prairie Solar
Goose Prairie Solar is a 80 MW solar power plant in Yakima County, Washington, operated by Goose Prairie Solar LLC. Its oldest generator still running came online in 2024. In 2025 it generated 177 GWh, about what 16,000 average Washington homes use in a year.
Goose Prairie Solar in context
Among the 8 solar plants in Washington in the EIA's inventory, it is the 3rd largest, about 23% of the state's 348 MW of solar capacity.
Yakima County has 8 power plants of 1 MW or more with 194 MW in all; Goose Prairie Solar is 41% of that and the 2nd largest of 2 solar plants there.
Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Yakima County goes 2.5 hours a year without power, the 23rd most of 31 counties in Washington. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Goose Prairie Solar (outlined) and other plants in Yakima County, shaded. 46.529, -120.240.
Plant facts
- Operator
- Goose Prairie Solar LLC
- Sector
- IPP Non-CHP
- Grid operator
- BPAT
- County
- Yakima County, WA
- EIA plant ID
- 67261
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GOOSE | Solar Photovoltaic | 80 MW | 2024 | – |
Nearby
Other plants in Yakima County
Questions
Goose Prairie Solar, answered
How much power does Goose Prairie Solar produce?
Goose Prairie Solar has 80 MW of capacity from one generator. In 2025 it generated 177 GWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does Goose Prairie Solar power?
Its 2025 output of 177 GWh equals the yearly electricity use of about 16,000 average Washington homes (945 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Goose Prairie Solar?
Goose Prairie Solar is in Yakima County, Washington, at about 46.529°, -120.240°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Yakima County goes 2.5 hours a year without power, the 23rd most of 31 counties in Washington. The county's page has the full outage record.
Who operates Goose Prairie Solar?
It is operated by Goose Prairie Solar LLC (EIA sector: IPP Non-CHP), and it feeds the Bonneville Power Administration.
When did Goose Prairie Solar open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Washington home's 945 kWh a month in 2025. Methodology.