Solar power plant · Yakima, WA
Ostrea Solar, LLC
Ostrea Solar, LLC is a 80 MW solar power plant in Yakima County, Washington, operated by Cypress Creek Renewables. Its oldest generator still running came online in 2026.
Ostrea Solar, LLC in context
Among the 8 solar plants in Washington in the EIA's inventory, it is the 2nd largest, about 23% of the state's 348 MW of solar capacity.
Yakima County has 8 power plants of 1 MW or more with 194 MW in all; Ostrea Solar, LLC is 41% of that and the largest of 2 solar plants there.
The average electricity customer in Yakima County goes 2.5 hours a year without power, the 23rd most of 31 counties in Washington. The county's page has the full outage record.
Where it is
Ostrea Solar, LLC (outlined) and other plants in Yakima County, shaded. 46.529, -119.979.
Plant facts
- Operator
- Cypress Creek Renewables
- Sector
- IPP Non-CHP
- Grid operator
- BPAT
- County
- Yakima County, WA
- EIA plant ID
- 66384
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Solar Photovoltaic | 80 MW | 2026 | – |
Nearby
Other plants in Yakima County
Questions
Ostrea Solar, LLC, answered
How much power does Ostrea Solar, LLC produce?
Ostrea Solar, LLC has 80 MW of capacity from one generator. No full year of generation is reported yet.
Where is Ostrea Solar, LLC?
Ostrea Solar, LLC is in Yakima County, Washington, at about 46.529°, -119.979°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Yakima County goes 2.5 hours a year without power, the 23rd most of 31 counties in Washington. The county's page has the full outage record.
Who operates Ostrea Solar, LLC?
It is operated by Cypress Creek Renewables (EIA sector: IPP Non-CHP), and it feeds the Bonneville Power Administration.
When did Ostrea Solar, LLC open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.