Solar power plant · Yakima, WA

Ostrea Solar, LLC

Ostrea Solar, LLC is a 80 MW solar power plant in Yakima County, Washington, operated by Cypress Creek Renewables. Its oldest generator still running came online in 2026.

Capacity80 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Ostrea Solar, LLC in context

Among the 8 solar plants in Washington in the EIA's inventory, it is the 2nd largest, about 23% of the state's 348 MW of solar capacity.

Yakima County has 8 power plants of 1 MW or more with 194 MW in all; Ostrea Solar, LLC is 41% of that and the largest of 2 solar plants there.

The average electricity customer in Yakima County goes 2.5 hours a year without power, the 23rd most of 31 counties in Washington. The county's page has the full outage record.

Where it is

Ostrea Solar, LLC (outlined) and other plants in Yakima County, shaded. 46.529, -119.979.

Plant facts

Operator
Cypress Creek Renewables
Sector
IPP Non-CHP
Grid operator
BPAT
County
Yakima County, WA
EIA plant ID
66384
Where Washington's power comes from → Washington power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GEN1 Solar Photovoltaic 80 MW 2026 –

Nearby

Other plants in Yakima County

Goose Prairie Solar · 80 MWTieton Dam Hydro Electric Project · 14 MWRoza · 13 MWDrop 2 (WA) · 2.5 MWCowiche · 1.7 MWDrop 3 (WA) · 1.6 MWOrchard Avenue 1 · 1.6 MW

Questions

Ostrea Solar, LLC, answered

How much power does Ostrea Solar, LLC produce?

Ostrea Solar, LLC has 80 MW of capacity from one generator. No full year of generation is reported yet.

Where is Ostrea Solar, LLC?

Ostrea Solar, LLC is in Yakima County, Washington, at about 46.529°, -119.979°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Yakima County goes 2.5 hours a year without power, the 23rd most of 31 counties in Washington. The county's page has the full outage record.

Who operates Ostrea Solar, LLC?

It is operated by Cypress Creek Renewables (EIA sector: IPP Non-CHP), and it feeds the Bonneville Power Administration.

When did Ostrea Solar, LLC open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.