Hydro power plant · Yakima, WA
Tieton Dam Hydro Electric Project
Tieton Dam Hydro Electric Project is a 14 MW hydro power plant in Yakima County, Washington, operated by City of Burbank Water and Power - (CA). Its oldest generator still running came online in 2006. In 2025 it generated 24 GWh, about what 2,100 average Washington homes use in a year.
Tieton Dam Hydro Electric Project in context
Among the 73 hydro plants in Washington in the EIA's inventory, it is the 45th largest, about 0.1% of the state's 22 GW of hydro capacity.
Yakima County has 8 power plants of 1 MW or more with 194 MW in all; Tieton Dam Hydro Electric Project is 7% of that and the largest of 6 hydro plants there.
Its capacity factor of 20% in 2025 is lower than the 34% typical for hydro plants across the US.
The average electricity customer in Yakima County goes 2.5 hours a year without power, the 23rd most of 31 counties in Washington. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Tieton Dam Hydro Electric Project (outlined) and other plants in Yakima County, shaded. 46.658, -121.129.
Plant facts
- Operator
- City of Burbank Water and Power - (CA)
- Sector
- Electric Utility
- Grid operator
- PACW
- County
- Yakima County, WA
- EIA plant ID
- 57496
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| UNIT1 | Conventional Hydroelectric | 6.9 MW | 2006 | – |
| UNIT2 | Conventional Hydroelectric | 6.9 MW | 2006 | – |
Nearby
Other plants in Yakima County
Questions
Tieton Dam Hydro Electric Project, answered
How much power does Tieton Dam Hydro Electric Project produce?
Tieton Dam Hydro Electric Project has 14 MW of capacity from 2 generators. In 2025 it generated 24 GWh, 20% of the most it could have made running flat out all year (its capacity factor).
How many homes does Tieton Dam Hydro Electric Project power?
Its 2025 output of 24 GWh equals the yearly electricity use of about 2,100 average Washington homes (945 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Tieton Dam Hydro Electric Project?
Tieton Dam Hydro Electric Project is in Yakima County, Washington, at about 46.658°, -121.129°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Yakima County goes 2.5 hours a year without power, the 23rd most of 31 counties in Washington. The county's page has the full outage record.
Who operates Tieton Dam Hydro Electric Project?
It is operated by City of Burbank Water and Power - (CA) (EIA sector: Electric Utility), and it feeds PacifiCorp West.
When did Tieton Dam Hydro Electric Project open?
Its oldest generator still running came online in 2006.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Washington home's 945 kWh a month in 2025. Methodology.