Solar power plant · El Paso, CO

Grazing Yak Solar

Grazing Yak Solar is a 35 MW solar power plant in El Paso County, Colorado, operated by Grazing Yak Solar, LLC. Its oldest generator still running came online in 2019. In 2025 it generated 77 GWh, about what 9,800 average Colorado homes use in a year.

Capacity35 MWNameplate, September 2026
Generated77 GWhIn 2025
Capacity factor25%Share of the most it could make, 2025
Generators1Oldest from 2019

Grazing Yak Solar in context

Among the 185 solar plants in Colorado in the EIA's inventory, it is the 19th largest, about 0.9% of the state's 3.8 GW of solar capacity.

El Paso County has 17 power plants of 1 MW or more with 2.0 GW in all; Grazing Yak Solar is 2% of that and the 3rd largest of 7 solar plants there.

Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in El Paso County goes 1.0 hours a year without power, the 38th most of 39 counties in Colorado. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0204060801002019202020212022202320242025GWh 77
020406080100201920212023202577

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Grazing Yak Solar (outlined) and other plants in El Paso County, shaded. 38.978, -104.253.

Plant facts

Operator
Grazing Yak Solar, LLC
Sector
IPP Non-CHP
Grid operator
WACM
County
El Paso County, CO
EIA plant ID
62376
Where Colorado's power comes from → Colorado power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PV1 Solar Photovoltaic 35 MW 2019 –

Questions

Grazing Yak Solar, answered

How much power does Grazing Yak Solar produce?

Grazing Yak Solar has 35 MW of capacity from one generator. In 2025 it generated 77 GWh, 25% of the most it could have made running flat out all year (its capacity factor).

How many homes does Grazing Yak Solar power?

Its 2025 output of 77 GWh equals the yearly electricity use of about 9,800 average Colorado homes (658 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Grazing Yak Solar?

Grazing Yak Solar is in El Paso County, Colorado, at about 38.978°, -104.253°. It is one of 17 power plants of 1 MW or more in the county. The average electricity customer in El Paso County goes 1.0 hours a year without power, the 38th most of 39 counties in Colorado. The county's page has the full outage record.

Who operates Grazing Yak Solar?

It is operated by Grazing Yak Solar, LLC (EIA sector: IPP Non-CHP), and it feeds WAPA Rocky Mountain.

When did Grazing Yak Solar open?

Its oldest generator still running came online in 2019.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average Colorado home's 658 kWh a month in 2025. Methodology.