Solar power plant · El Paso, CO
Palmer Solar
Palmer Solar is a 60 MW solar power plant in El Paso County, Colorado, operated by Deriva Energy. Its oldest generator still running came online in 2020. In 2025 it generated 140 GWh, about what 18,000 average Colorado homes use in a year.
Palmer Solar in context
Among the 185 solar plants in Colorado in the EIA's inventory, it is the 15th largest, about 1.6% of the state's 3.8 GW of solar capacity.
El Paso County has 17 power plants of 1 MW or more with 2.0 GW in all; Palmer Solar is 3% of that and the 2nd largest of 7 solar plants there.
Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in El Paso County goes 1.0 hours a year without power, the 38th most of 39 counties in Colorado. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Palmer Solar (outlined) and other plants in El Paso County, shaded. 38.630, -104.653.
Plant facts
- Operator
- Deriva Energy
- Sector
- IPP Non-CHP
- Grid operator
- WACM
- County
- El Paso County, CO
- EIA plant ID
- 62495
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 20181 | Solar Photovoltaic | 60 MW | 2020 | – |
Questions
Palmer Solar, answered
How much power does Palmer Solar produce?
Palmer Solar has 60 MW of capacity from one generator. In 2025 it generated 140 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Palmer Solar power?
Its 2025 output of 140 GWh equals the yearly electricity use of about 18,000 average Colorado homes (658 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Palmer Solar?
Palmer Solar is in El Paso County, Colorado, at about 38.630°, -104.653°. It is one of 17 power plants of 1 MW or more in the county. The average electricity customer in El Paso County goes 1.0 hours a year without power, the 38th most of 39 counties in Colorado. The county's page has the full outage record.
Who operates Palmer Solar?
It is operated by Deriva Energy (EIA sector: IPP Non-CHP), and it feeds WAPA Rocky Mountain.
When did Palmer Solar open?
Its oldest generator still running came online in 2020.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Colorado home's 658 kWh a month in 2025. Methodology.