Solar power plant · Grimes, TX

Grimes County Solar

Grimes County Solar is a 210 MW solar power plant in Grimes County, Texas, operated by Grimes County Solar Project, LLC. Its oldest generator still running came online in 2026.

Capacity210 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Grimes County Solar in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 70th largest, about 0.6% of the state's 37 GW of solar capacity.

Grimes County has 4 power plants of 1 MW or more with 1.3 GW in all; Grimes County Solar is 16% of that.

The average electricity customer in Grimes County goes 9.4 hours a year without power, the 126th most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Grimes County Solar (outlined) and other plants in Grimes County, shaded. 30.651, -96.091.

Plant facts

Operator
Grimes County Solar Project, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Grimes County, TX
EIA plant ID
67046
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GS1 Solar Photovoltaic 210 MW 2026 –

Questions

Grimes County Solar, answered

How much power does Grimes County Solar produce?

Grimes County Solar has 210 MW of capacity from one generator. No full year of generation is reported yet.

Where is Grimes County Solar?

Grimes County Solar is in Grimes County, Texas, at about 30.651°, -96.091°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Grimes County goes 9.4 hours a year without power, the 126th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Grimes County Solar?

It is operated by Grimes County Solar Project, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Grimes County Solar open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.