Solar power plant · Levy, FL
Hardeetown Solar Power Plant
Hardeetown Solar Power Plant is a 75 MW solar power plant in Levy County, Florida, operated by Duke Energy Florida, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 166 GWh, about what 13,000 average Florida homes use in a year.
Hardeetown Solar Power Plant in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 28th largest, about 0.5% of the state's 14 GW of solar capacity.
Levy County has 3 power plants of 1 MW or more with 224 MW in all; Hardeetown Solar Power Plant is 33% of that and the 2nd largest of 3 solar plants there.
Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Levy County goes 12 hours a year without power, the 29th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Hardeetown Solar Power Plant (outlined) and other plants in Levy County, shaded. 29.486, -82.843.
Plant facts
- Operator
- Duke Energy Florida, LLC
- Sector
- Electric Utility
- Grid operator
- FPC
- County
- Levy County, FL
- EIA plant ID
- 65173
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PV1 | Solar Photovoltaic | 75 MW | 2023 | – |
Nearby
Other plants in Levy County
Questions
Hardeetown Solar Power Plant, answered
How much power does Hardeetown Solar Power Plant produce?
Hardeetown Solar Power Plant has 75 MW of capacity from one generator. In 2025 it generated 166 GWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does Hardeetown Solar Power Plant power?
Its 2025 output of 166 GWh equals the yearly electricity use of about 13,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Hardeetown Solar Power Plant?
Hardeetown Solar Power Plant is in Levy County, Florida, at about 29.486°, -82.843°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Levy County goes 12 hours a year without power, the 29th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Hardeetown Solar Power Plant?
It is operated by Duke Energy Florida, LLC (EIA sector: Electric Utility), and it feeds balancing authority FPC.
When did Hardeetown Solar Power Plant open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.