Solar power plant · Levy, FL

Whistling Duck I

Whistling Duck I is a 75 MW solar power plant in Levy County, Florida, operated by Origis Energy USA, Inc. Its oldest generator still running came online in 2025. In 2025 it generated 0.9 GWh, about what 68 average Florida homes use in a year.

Capacity75 MWNameplate, September 2026
Generated0.9 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Whistling Duck I in context

Among the 226 solar plants in Florida in the EIA's inventory, it is the 14th largest, about 0.5% of the state's 14 GW of solar capacity.

Levy County has 3 power plants of 1 MW or more with 224 MW in all; Whistling Duck I is 33% of that and the largest of 3 solar plants there.

The average electricity customer in Levy County goes 12 hours a year without power, the 29th most of 67 counties in Florida. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Whistling Duck I (outlined) and other plants in Levy County, shaded. 29.472, -82.431.

Plant facts

Operator
Origis Energy USA, Inc
Sector
IPP Non-CHP
Grid operator
FPC
County
Levy County, FL
EIA plant ID
68595
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
OEFL8 Solar Photovoltaic 75 MW 2025 –

Questions

Whistling Duck I, answered

How much power does Whistling Duck I produce?

Whistling Duck I has 75 MW of capacity from one generator. In 2025 it generated 0.9 GWh.

How many homes does Whistling Duck I power?

Its 2025 output of 0.9 GWh equals the yearly electricity use of about 68 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Whistling Duck I?

Whistling Duck I is in Levy County, Florida, at about 29.472°, -82.431°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Levy County goes 12 hours a year without power, the 29th most of 67 counties in Florida. The county's page has the full outage record.

Who operates Whistling Duck I?

It is operated by Origis Energy USA, Inc (EIA sector: IPP Non-CHP), and it feeds balancing authority FPC.

When did Whistling Duck I open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.