Natural gas power plant · Campbell, WY

Hartzog

Hartzog is a 23 MW natural gas power plant in Campbell County, Wyoming, operated by Basin Electric Power Coop. Its oldest generator still running came online in 2002. In 2025 it generated 0.1 GWh, about what 10 average Wyoming homes use in a year.

Capacity23 MWNameplate, September 2026
Generated0.1 GWhIn 2025
Capacity factor0%Share of the most it could make, 2025
Generators3Oldest from 2002

Hartzog in context

Among the 10 natural gas plants in Wyoming in the EIA's inventory, it is the 5th largest, about 0.8% of the state's 2.7 GW of natural gas capacity.

Campbell County has 9 power plants of 1 MW or more with 1.4 GW in all; Hartzog is 2% of that and the 2nd largest of 3 natural gas plants there.

Its capacity factor of 0% in 2025 is lower than the 23% typical for natural gas plants across the US.

The average electricity customer in Campbell County goes 3.3 hours a year without power, the 6th most of 20 counties in Wyoming. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

000111120182019202020212022202320242025GWh 0
000111120192021202320250

Where it is

Hartzog (outlined) and other plants in Campbell County, shaded. 43.829, -105.532.

Plant facts

Operator
Basin Electric Power Coop
Sector
Electric Utility
Grid operator
WACM
County
Campbell County, WY
EIA plant ID
8026
Where Wyoming's power comes from → Wyoming power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Natural Gas Fired Combustion Turbine 7.5 MW 2002 –
2 Natural Gas Fired Combustion Turbine 7.5 MW 2002 –
3 Natural Gas Fired Combustion Turbine 7.5 MW 2002 –

Questions

Hartzog, answered

How much power does Hartzog produce?

Hartzog has 23 MW of capacity from 3 generators. In 2025 it generated 0.1 GWh, 0% of the most it could have made running flat out all year (its capacity factor).

How many homes does Hartzog power?

Its 2025 output of 0.1 GWh equals the yearly electricity use of about 10 average Wyoming homes (835 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Hartzog?

Hartzog is in Campbell County, Wyoming, at about 43.829°, -105.532°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Campbell County goes 3.3 hours a year without power, the 6th most of 20 counties in Wyoming. The county's page has the full outage record.

Who operates Hartzog?

It is operated by Basin Electric Power Coop (EIA sector: Electric Utility), and it feeds WAPA Rocky Mountain.

When did Hartzog open?

Its oldest generator still running came online in 2002.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Wyoming home's 835 kWh a month in 2025. Methodology.