Coal power plant · Campbell, WY

Neil Simpson II

Neil Simpson II is a 130 MW coal power plant in Campbell County, Wyoming, operated by Black Hills Power, Inc.. Its oldest generator still running came online in 1995. In 2025 it generated 642 GWh, about what 64,000 average Wyoming homes use in a year.

Capacity130 MWNameplate, September 2026
Generated642 GWhIn 2025
Capacity factor56%Share of the most it could make, 2025
Generators2Oldest from 1995

Neil Simpson II in context

Among the 11 coal plants in Wyoming in the EIA's inventory, it is the 6th largest, about 2.7% of the state's 4.7 GW of coal capacity.

Campbell County has 9 power plants of 1 MW or more with 1.4 GW in all; Neil Simpson II is 10% of that and the 3rd largest of 6 coal plants there.

Its capacity factor of 56% in 2025 is higher than the 45% typical for coal plants across the US.

The average electricity customer in Campbell County goes 3.3 hours a year without power, the 6th most of 20 counties in Wyoming. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060080020182019202020212022202320242025GWh 642
02004006008002019202120232025642

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Neil Simpson II (outlined) and other plants in Campbell County, shaded. 44.286, -105.383.

Plant facts

Operator
Black Hills Power, Inc.
Sector
Electric Utility
Grid operator
WACM
County
Campbell County, WY
EIA plant ID
7504
  • Coal90 MW69%
  • Natural gas40 MW31%
Where Wyoming's power comes from → Wyoming power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
2 Conventional Steam Coal 90 MW 1995 –
GT1 Natural Gas Fired Combustion Turbine 40 MW 2000 –

Questions

Neil Simpson II, answered

How much power does Neil Simpson II produce?

Neil Simpson II has 130 MW of capacity from 2 generators. In 2025 it generated 642 GWh, 56% of the most it could have made running flat out all year (its capacity factor).

How many homes does Neil Simpson II power?

Its 2025 output of 642 GWh equals the yearly electricity use of about 64,000 average Wyoming homes (835 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Neil Simpson II?

Neil Simpson II is in Campbell County, Wyoming, at about 44.286°, -105.383°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Campbell County goes 3.3 hours a year without power, the 6th most of 20 counties in Wyoming. The county's page has the full outage record.

Who operates Neil Simpson II?

It is operated by Black Hills Power, Inc. (EIA sector: Electric Utility), and it feeds WAPA Rocky Mountain.

When did Neil Simpson II open?

Its oldest generator still running came online in 1995.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Wyoming home's 835 kWh a month in 2025. Methodology.