Solar power plant · Alachua, FL

High Springs Solar Power Plant

High Springs Solar Power Plant is a 75 MW solar power plant in Alachua County, Florida, operated by Duke Energy Florida, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 165 GWh, about what 12,000 average Florida homes use in a year.

Capacity75 MWNameplate, September 2026
Generated165 GWhIn 2025
Capacity factor25%Share of the most it could make, 2025
Generators1Oldest from 2023

High Springs Solar Power Plant in context

Among the 226 solar plants in Florida in the EIA's inventory, it is the 27th largest, about 0.5% of the state's 14 GW of solar capacity.

Alachua County has 12 power plants of 1 MW or more with 957 MW in all; High Springs Solar Power Plant is 8% of that and the largest of 6 solar plants there.

Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Alachua County goes 3.9 hours a year without power, the 55th most of 67 counties in Florida. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

050100150200202320242025GWh 165
050100150200202320242025165

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

High Springs Solar Power Plant (outlined) and other plants in Alachua County, shaded. 29.810, -82.640.

Plant facts

Operator
Duke Energy Florida, LLC
Sector
Electric Utility
Grid operator
FPC
County
Alachua County, FL
EIA plant ID
65172
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PV1 Solar Photovoltaic 75 MW 2023 –

Nearby

Other plants in Alachua County

Questions

High Springs Solar Power Plant, answered

How much power does High Springs Solar Power Plant produce?

High Springs Solar Power Plant has 75 MW of capacity from one generator. In 2025 it generated 165 GWh, 25% of the most it could have made running flat out all year (its capacity factor).

How many homes does High Springs Solar Power Plant power?

Its 2025 output of 165 GWh equals the yearly electricity use of about 12,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is High Springs Solar Power Plant?

High Springs Solar Power Plant is in Alachua County, Florida, at about 29.810°, -82.640°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Alachua County goes 3.9 hours a year without power, the 55th most of 67 counties in Florida. The county's page has the full outage record.

Who operates High Springs Solar Power Plant?

It is operated by Duke Energy Florida, LLC (EIA sector: Electric Utility), and it feeds balancing authority FPC.

When did High Springs Solar Power Plant open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.