Natural gas power plant · Alachua, FL

University of Florida

University of Florida is a 54 MW natural gas power plant in Alachua County, Florida, operated by Duke Energy Florida, LLC. Its oldest generator still running came online in 1994. In 2025 it generated 388 GWh, about what 29,000 average Florida homes use in a year.

Capacity54 MWNameplate, September 2026
Generated388 GWhIn 2025
Capacity factor82%Share of the most it could make, 2025
Generators1Oldest from 1994

University of Florida in context

Among the 68 natural gas plants in Florida in the EIA's inventory, it is the 53rd largest, about 0.1% of the state's 56 GW of natural gas capacity.

Alachua County has 12 power plants of 1 MW or more with 957 MW in all; University of Florida is 6% of that and the 3rd largest of 4 natural gas plants there.

Its capacity factor of 82% in 2025 is higher than the 23% typical for natural gas plants across the US.

The average electricity customer in Alachua County goes 3.9 hours a year without power, the 55th most of 67 counties in Florida. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040050020182019202020212022202320242025GWh 388
01002003004005002019202120232025388

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

University of Florida (outlined) and other plants in Alachua County, shaded. 29.640, -82.349.

Plant facts

Operator
Duke Energy Florida, LLC
Sector
Electric Utility
Grid operator
FPC
County
Alachua County, FL
EIA plant ID
7345
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
P1 Natural Gas Fired Combustion Turbine 54 MW 1994 –

Questions

University of Florida, answered

How much power does University of Florida produce?

University of Florida has 54 MW of capacity from one generator. In 2025 it generated 388 GWh, 82% of the most it could have made running flat out all year (its capacity factor).

How many homes does University of Florida power?

Its 2025 output of 388 GWh equals the yearly electricity use of about 29,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is University of Florida?

University of Florida is in Alachua County, Florida, at about 29.640°, -82.349°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Alachua County goes 3.9 hours a year without power, the 55th most of 67 counties in Florida. The county's page has the full outage record.

Who operates University of Florida?

It is operated by Duke Energy Florida, LLC (EIA sector: Electric Utility), and it feeds balancing authority FPC.

When did University of Florida open?

Its oldest generator still running came online in 1994.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.