Solar power plant · Highlands, FL
Highland Solar South
Highland Solar South is a 75 MW solar power plant in Highlands County, Florida, operated by Placid Solar, LLC. Its oldest generator still running came online in 2026.
Highland Solar South in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 23rd largest, about 0.5% of the state's 14 GW of solar capacity.
Highlands County has 2 power plants of 1 MW or more with 137 MW in all; Highland Solar South is 55% of that and the largest of 2 solar plants there.
The average electricity customer in Highlands County goes 21 hours a year without power, the 14th most of 67 counties in Florida. The county's page has the full outage record.
Where it is
Highland Solar South (outlined) and other plants in Highlands County, shaded. 27.266, -81.408.
Plant facts
- Operator
- Placid Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- FPC
- County
- Highlands County, FL
- EIA plant ID
- 64346
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 9999 | Solar Photovoltaic | 75 MW | 2026 | – |
Nearby
Other plants in Highlands County
Questions
Highland Solar South, answered
How much power does Highland Solar South produce?
Highland Solar South has 75 MW of capacity from one generator. No full year of generation is reported yet.
Where is Highland Solar South?
Highland Solar South is in Highlands County, Florida, at about 27.266°, -81.408°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Highlands County goes 21 hours a year without power, the 14th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Highland Solar South?
It is operated by Placid Solar, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority FPC.
When did Highland Solar South open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.