Solar power plant · Highlands, FL

Lake Placid Solar Power Plant

Lake Placid Solar Power Plant is a 62 MW solar power plant in Highlands County, Florida, operated by Duke Energy Florida, LLC. Its oldest generator still running came online in 2019. In 2025 it generated 73 GWh, about what 5,500 average Florida homes use in a year.

Capacity62 MWNameplate, September 2026
Generated73 GWhIn 2025
Capacity factor13%Share of the most it could make, 2025
Generators2Oldest from 2019

Lake Placid Solar Power Plant in context

Among the 226 solar plants in Florida in the EIA's inventory, it is the 167th largest, about 0.4% of the state's 14 GW of solar capacity.

Highlands County has 2 power plants of 1 MW or more with 137 MW in all; Lake Placid Solar Power Plant is 45% of that and the 2nd largest of 2 solar plants there.

Its capacity factor of 13% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in Highlands County goes 21 hours a year without power, the 14th most of 67 counties in Florida. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0204060801001202019202020212022202320242025GWh 73
020406080100120201920212023202573

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Lake Placid Solar Power Plant (outlined) and other plants in Highlands County, shaded. 27.331, -81.364.

Plant facts

Operator
Duke Energy Florida, LLC
Sector
Electric Utility
Grid operator
FPC
County
Highlands County, FL
EIA plant ID
62541
  • Solar45 MW72%
  • Storage17 MW28%
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PV1 Solar Photovoltaic 45 MW 2019 –
ES1 Batteries 17 MW · 36 MWh 2023 –

Nearby

Other plants in Highlands County

Questions

Lake Placid Solar Power Plant, answered

How much power does Lake Placid Solar Power Plant produce?

Lake Placid Solar Power Plant has 62 MW of capacity from 2 generators. In 2025 it generated 73 GWh, 13% of the most it could have made running flat out all year (its capacity factor).

How many homes does Lake Placid Solar Power Plant power?

Its 2025 output of 73 GWh equals the yearly electricity use of about 5,500 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Lake Placid Solar Power Plant?

Lake Placid Solar Power Plant is in Highlands County, Florida, at about 27.331°, -81.364°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Highlands County goes 21 hours a year without power, the 14th most of 67 counties in Florida. The county's page has the full outage record.

Who operates Lake Placid Solar Power Plant?

It is operated by Duke Energy Florida, LLC (EIA sector: Electric Utility), and it feeds balancing authority FPC.

When did Lake Placid Solar Power Plant open?

Its oldest generator still running came online in 2019.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.