Wind power plant · Haskell, TX
Inertia Wind Project
Inertia Wind Project is a 301 MW wind power plant in Haskell County, Texas, operated by Inertia Wind Project, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 1.2 TWh, about what 94,000 average Texas homes use in a year.
Inertia Wind Project in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 25th largest, about 0.7% of the state's 45 GW of wind capacity.
Haskell County has 8 power plants of 1 MW or more with 1.8 GW in all; Inertia Wind Project is 17% of that and the largest of 4 wind plants there.
Its capacity factor of 47% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Haskell County goes 19 hours a year without power, the 44th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Inertia Wind Project (outlined) and other plants in Haskell County, shaded. 33.187, -99.595.
Plant facts
- Operator
- Inertia Wind Project, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Haskell County, TX
- EIA plant ID
- 65546
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WINER | Onshore Wind Turbine | 301 MW | 2023 | – |
Questions
Inertia Wind Project, answered
How much power does Inertia Wind Project produce?
Inertia Wind Project has 301 MW of capacity from one generator. In 2025 it generated 1.2 TWh, 47% of the most it could have made running flat out all year (its capacity factor).
How many homes does Inertia Wind Project power?
Its 2025 output of 1.2 TWh equals the yearly electricity use of about 94,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Inertia Wind Project?
Inertia Wind Project is in Haskell County, Texas, at about 33.187°, -99.595°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Haskell County goes 19 hours a year without power, the 44th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Inertia Wind Project?
It is operated by Inertia Wind Project, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Inertia Wind Project open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.