Solar power plant · Haskell, TX
Millers Branch Solar
Millers Branch Solar is a 380 MW solar power plant in Haskell County, Texas, operated by Southern Power Co. Its oldest generator still running came online in 2026.
Millers Branch Solar in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 22nd largest, about 1.0% of the state's 37 GW of solar capacity.
Haskell County has 8 power plants of 1 MW or more with 1.8 GW in all; Millers Branch Solar is 21% of that and the largest of 3 solar plants there.
The average electricity customer in Haskell County goes 19 hours a year without power, the 44th most of 240 counties in Texas. The county's page has the full outage record.
Where it is
Millers Branch Solar (outlined) and other plants in Haskell County, shaded. 33.221, -99.587.
Plant facts
- Operator
- Southern Power Co
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Haskell County, TX
- EIA plant ID
- 69101
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| MLB01 | Solar Photovoltaic | 200 MW | 2026 | – |
| MLB02 | Solar Photovoltaic | 180 MW | 2026 | – |
Planned
| Generator | Technology | Capacity | Expected |
|---|---|---|---|
| MLB03 | Solar Photovoltaic | 132 MW | 2026 |
Questions
Millers Branch Solar, answered
How much power does Millers Branch Solar produce?
Millers Branch Solar has 380 MW of capacity from 2 generators. No full year of generation is reported yet.
Where is Millers Branch Solar?
Millers Branch Solar is in Haskell County, Texas, at about 33.221°, -99.587°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Haskell County goes 19 hours a year without power, the 44th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Millers Branch Solar?
It is operated by Southern Power Co (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Millers Branch Solar open?
Its oldest generator still running came online in 2026. 1 more generator is planned.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.