Solar power plant · Haskell, TX

Millers Branch Solar

Millers Branch Solar is a 380 MW solar power plant in Haskell County, Texas, operated by Southern Power Co. Its oldest generator still running came online in 2026.

Capacity380 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators2Oldest from 2026

Millers Branch Solar in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 22nd largest, about 1.0% of the state's 37 GW of solar capacity.

Haskell County has 8 power plants of 1 MW or more with 1.8 GW in all; Millers Branch Solar is 21% of that and the largest of 3 solar plants there.

The average electricity customer in Haskell County goes 19 hours a year without power, the 44th most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Millers Branch Solar (outlined) and other plants in Haskell County, shaded. 33.221, -99.587.

Plant facts

Operator
Southern Power Co
Sector
IPP Non-CHP
Grid operator
ERCO
County
Haskell County, TX
EIA plant ID
69101
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
MLB01 Solar Photovoltaic 200 MW 2026 –
MLB02 Solar Photovoltaic 180 MW 2026 –

Planned

GeneratorTechnologyCapacityExpected
MLB03Solar Photovoltaic132 MW2026

Questions

Millers Branch Solar, answered

How much power does Millers Branch Solar produce?

Millers Branch Solar has 380 MW of capacity from 2 generators. No full year of generation is reported yet.

Where is Millers Branch Solar?

Millers Branch Solar is in Haskell County, Texas, at about 33.221°, -99.587°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Haskell County goes 19 hours a year without power, the 44th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Millers Branch Solar?

It is operated by Southern Power Co (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Millers Branch Solar open?

Its oldest generator still running came online in 2026. 1 more generator is planned.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.