Wind power plant · Wheatland, MT
Judith Gap Wind Energy Center
Judith Gap Wind Energy Center is a 135 MW wind power plant in Wheatland County, Montana, operated by Invenergy Services LLC. Its oldest generator still running came online in 2005. In 2025 it generated 412 GWh, about what 40,000 average Montana homes use in a year.
Judith Gap Wind Energy Center in context
Among the 23 wind plants in Montana in the EIA's inventory, it is the 6th largest, about 6.3% of the state's 2.1 GW of wind capacity.
Wheatland County has 4 power plants of 1 MW or more with 165 MW in all; Judith Gap Wind Energy Center is 82% of that and the largest of 4 wind plants there.
Its capacity factor of 35% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Wheatland County goes 20 hours a year without power, the 3rd most of 35 counties in Montana. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Judith Gap Wind Energy Center (outlined) and other plants in Wheatland County, shaded. 46.572, -109.753.
Plant facts
- Operator
- Invenergy Services LLC
- Sector
- IPP Non-CHP
- Grid operator
- NWMT
- County
- Wheatland County, MT
- EIA plant ID
- 56377
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 135 MW | 2005 | – |
Nearby
Other plants in Wheatland County
Questions
Judith Gap Wind Energy Center, answered
How much power does Judith Gap Wind Energy Center produce?
Judith Gap Wind Energy Center has 135 MW of capacity from one generator. In 2025 it generated 412 GWh, 35% of the most it could have made running flat out all year (its capacity factor).
How many homes does Judith Gap Wind Energy Center power?
Its 2025 output of 412 GWh equals the yearly electricity use of about 40,000 average Montana homes (853 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Judith Gap Wind Energy Center?
Judith Gap Wind Energy Center is in Wheatland County, Montana, at about 46.572°, -109.753°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Wheatland County goes 20 hours a year without power, the 3rd most of 35 counties in Montana. The county's page has the full outage record.
Who operates Judith Gap Wind Energy Center?
It is operated by Invenergy Services LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority NWMT.
When did Judith Gap Wind Energy Center open?
Its oldest generator still running came online in 2005.