Wind power plant · Wheatland, MT
Musselshell Wind Project
Musselshell Wind Project is a 10 MW wind power plant in Wheatland County, Montana, operated by Musselshell Wind Project LLC. Its oldest generator still running came online in 2012. In 2025 it generated 24 GWh, about what 2,300 average Montana homes use in a year.
Musselshell Wind Project in context
Among the 23 wind plants in Montana in the EIA's inventory, it is the 18th largest, about 0.5% of the state's 2.1 GW of wind capacity.
Wheatland County has 4 power plants of 1 MW or more with 165 MW in all; Musselshell Wind Project is 6% of that and the 2nd largest of 4 wind plants there.
Its capacity factor of 27% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Wheatland County goes 20 hours a year without power, the 3rd most of 35 counties in Montana. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Musselshell Wind Project (outlined) and other plants in Wheatland County, shaded. 46.275, -109.483.
Plant facts
- Operator
- Musselshell Wind Project LLC
- Sector
- IPP Non-CHP
- Grid operator
- NWMT
- County
- Wheatland County, MT
- EIA plant ID
- 57963
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| MS01 | Onshore Wind Turbine | 10 MW | 2012 | – |
Nearby
Other plants in Wheatland County
Questions
Musselshell Wind Project, answered
How much power does Musselshell Wind Project produce?
Musselshell Wind Project has 10 MW of capacity from one generator. In 2025 it generated 24 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Musselshell Wind Project power?
Its 2025 output of 24 GWh equals the yearly electricity use of about 2,300 average Montana homes (853 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Musselshell Wind Project?
Musselshell Wind Project is in Wheatland County, Montana, at about 46.275°, -109.483°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Wheatland County goes 20 hours a year without power, the 3rd most of 35 counties in Montana. The county's page has the full outage record.
Who operates Musselshell Wind Project?
It is operated by Musselshell Wind Project LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority NWMT.
When did Musselshell Wind Project open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Montana home's 853 kWh a month in 2025. Methodology.