Wind power plant · Wheatland, MT
Musselshell Wind Project Two LLC
Musselshell Wind Project Two LLC is a 10 MW wind power plant in Wheatland County, Montana, operated by Musselshell Wind Project Two LLC. Its oldest generator still running came online in 2012. In 2025 it generated 27 GWh, about what 2,700 average Montana homes use in a year.
Musselshell Wind Project Two LLC in context
Among the 23 wind plants in Montana in the EIA's inventory, it is the 19th largest, about 0.5% of the state's 2.1 GW of wind capacity.
Wheatland County has 4 power plants of 1 MW or more with 165 MW in all; Musselshell Wind Project Two LLC is 6% of that and the 3rd largest of 4 wind plants there.
Its capacity factor of 31% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Wheatland County goes 20 hours a year without power, the 3rd most of 35 counties in Montana. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Musselshell Wind Project Two LLC (outlined) and other plants in Wheatland County, shaded. 46.275, -109.483.
Plant facts
- Operator
- Musselshell Wind Project Two LLC
- Sector
- IPP Non-CHP
- Grid operator
- NWMT
- County
- Wheatland County, MT
- EIA plant ID
- 57965
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| MS02 | Onshore Wind Turbine | 10 MW | 2012 | – |
Nearby
Other plants in Wheatland County
Questions
Musselshell Wind Project Two LLC, answered
How much power does Musselshell Wind Project Two LLC produce?
Musselshell Wind Project Two LLC has 10 MW of capacity from one generator. In 2025 it generated 27 GWh, 31% of the most it could have made running flat out all year (its capacity factor).
How many homes does Musselshell Wind Project Two LLC power?
Its 2025 output of 27 GWh equals the yearly electricity use of about 2,700 average Montana homes (853 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Musselshell Wind Project Two LLC?
Musselshell Wind Project Two LLC is in Wheatland County, Montana, at about 46.275°, -109.483°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Wheatland County goes 20 hours a year without power, the 3rd most of 35 counties in Montana. The county's page has the full outage record.
Who operates Musselshell Wind Project Two LLC?
It is operated by Musselshell Wind Project Two LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority NWMT.
When did Musselshell Wind Project Two LLC open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Montana home's 853 kWh a month in 2025. Methodology.