Wind power plant · Wheatland, MT

Musselshell Wind Project Two LLC

Musselshell Wind Project Two LLC is a 10 MW wind power plant in Wheatland County, Montana, operated by Musselshell Wind Project Two LLC. Its oldest generator still running came online in 2012. In 2025 it generated 27 GWh, about what 2,700 average Montana homes use in a year.

Capacity10 MWNameplate, September 2026
Generated27 GWhIn 2025
Capacity factor31%Share of the most it could make, 2025
Generators1Oldest from 2012

Musselshell Wind Project Two LLC in context

Among the 23 wind plants in Montana in the EIA's inventory, it is the 19th largest, about 0.5% of the state's 2.1 GW of wind capacity.

Wheatland County has 4 power plants of 1 MW or more with 165 MW in all; Musselshell Wind Project Two LLC is 6% of that and the 3rd largest of 4 wind plants there.

Its capacity factor of 31% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Wheatland County goes 20 hours a year without power, the 3rd most of 35 counties in Montana. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

01020304020182019202020212022202320242025GWh 27
010203040201920212023202527

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Musselshell Wind Project Two LLC (outlined) and other plants in Wheatland County, shaded. 46.275, -109.483.

Plant facts

Operator
Musselshell Wind Project Two LLC
Sector
IPP Non-CHP
Grid operator
NWMT
County
Wheatland County, MT
EIA plant ID
57965
Where Montana's power comes from → Montana power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
MS02 Onshore Wind Turbine 10 MW 2012 –

Nearby

Other plants in Wheatland County

Questions

Musselshell Wind Project Two LLC, answered

How much power does Musselshell Wind Project Two LLC produce?

Musselshell Wind Project Two LLC has 10 MW of capacity from one generator. In 2025 it generated 27 GWh, 31% of the most it could have made running flat out all year (its capacity factor).

How many homes does Musselshell Wind Project Two LLC power?

Its 2025 output of 27 GWh equals the yearly electricity use of about 2,700 average Montana homes (853 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Musselshell Wind Project Two LLC?

Musselshell Wind Project Two LLC is in Wheatland County, Montana, at about 46.275°, -109.483°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Wheatland County goes 20 hours a year without power, the 3rd most of 35 counties in Montana. The county's page has the full outage record.

Who operates Musselshell Wind Project Two LLC?

It is operated by Musselshell Wind Project Two LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority NWMT.

When did Musselshell Wind Project Two LLC open?

Its oldest generator still running came online in 2012.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Montana home's 853 kWh a month in 2025. Methodology.