Solar power plant · Kaufman, TX

Kaufman Solar

Kaufman Solar is a 200 MW solar power plant in Kaufman County, Texas, operated by Kaufman Solar, LLC. Its oldest generator still running came online in 2026.

Capacity200 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Kaufman Solar in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 93rd largest, about 0.5% of the state's 37 GW of solar capacity.

Kaufman County has 4 power plants of 1 MW or more with 2.4 GW in all; Kaufman Solar is 8% of that and the 2nd largest of 2 solar plants there.

The average electricity customer in Kaufman County goes 5.9 hours a year without power, the 183rd most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Kaufman Solar (outlined) and other plants in Kaufman County, shaded. 32.537, -96.221.

Plant facts

Operator
Kaufman Solar, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Kaufman County, TX
EIA plant ID
69585
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
5568 Solar Photovoltaic 200 MW 2026 –

Questions

Kaufman Solar, answered

How much power does Kaufman Solar produce?

Kaufman Solar has 200 MW of capacity from one generator. No full year of generation is reported yet.

Where is Kaufman Solar?

Kaufman Solar is in Kaufman County, Texas, at about 32.537°, -96.221°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Kaufman County goes 5.9 hours a year without power, the 183rd most of 240 counties in Texas. The county's page has the full outage record.

Who operates Kaufman Solar?

It is operated by Kaufman Solar, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Kaufman Solar open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.