Solar power plant · Kaufman, TX

Lily Solar Hybrid

Lily Solar Hybrid is a 202 MW solar power plant in Kaufman County, Texas, operated by Lily Solar, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 318 GWh, about what 24,000 average Texas homes use in a year.

Capacity202 MWNameplate, September 2026
Generated318 GWhIn 2025
Capacity factor18%Share of the most it could make, 2025
Generators2Oldest from 2021

Lily Solar Hybrid in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 75th largest, about 0.5% of the state's 37 GW of solar capacity.

Kaufman County has 4 power plants of 1 MW or more with 2.4 GW in all; Lily Solar Hybrid is 8% of that and the largest of 2 solar plants there.

Its capacity factor of 18% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Kaufman County goes 5.9 hours a year without power, the 183rd most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040050020212022202320242025GWh 318
010020030040050020212022202320242025318

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Lily Solar Hybrid (outlined) and other plants in Kaufman County, shaded. 32.533, -96.429.

Plant facts

Operator
Lily Solar, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Kaufman County, TX
EIA plant ID
63892
  • Solar147 MW73%
  • Storage55 MW27%
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
LILY Solar Photovoltaic 147 MW 2021 –
LILYB Batteries 55 MW · 81 MWh 2021 –

Questions

Lily Solar Hybrid, answered

How much power does Lily Solar Hybrid produce?

Lily Solar Hybrid has 202 MW of capacity from 2 generators. In 2025 it generated 318 GWh, 18% of the most it could have made running flat out all year (its capacity factor).

How many homes does Lily Solar Hybrid power?

Its 2025 output of 318 GWh equals the yearly electricity use of about 24,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Lily Solar Hybrid?

Lily Solar Hybrid is in Kaufman County, Texas, at about 32.533°, -96.429°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Kaufman County goes 5.9 hours a year without power, the 183rd most of 240 counties in Texas. The county's page has the full outage record.

Who operates Lily Solar Hybrid?

It is operated by Lily Solar, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Lily Solar Hybrid open?

Its oldest generator still running came online in 2021.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.