Wind power plant · Lincoln, CO

Limon III Wind LLC

Limon III Wind LLC is a 201 MW wind power plant in Lincoln County, Colorado, operated by Limon. Its oldest generator still running came online in 2014. In 2025 it generated 650 GWh, about what 82,000 average Colorado homes use in a year.

Capacity201 MWNameplate, September 2026
Generated650 GWhIn 2025
Capacity factor37%Share of the most it could make, 2025
Generators1Oldest from 2014

Limon III Wind LLC in context

Among the 34 wind plants in Colorado in the EIA's inventory, it is the 11th largest, about 3.4% of the state's 5.9 GW of wind capacity.

Lincoln County has 5 power plants of 1 MW or more with 1.0 GW in all; Limon III Wind LLC is 20% of that and the 2nd largest of 4 wind plants there.

Its capacity factor of 37% in 2025 is higher than the 32% typical for wind plants across the US.

The average electricity customer in Lincoln County goes 2.8 hours a year without power, the 24th most of 39 counties in Colorado. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02004006008001,00020182019202020212022202320242025GWh 650
02004006008001,0002019202120232025650

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Limon III Wind LLC (outlined) and other plants in Lincoln County, shaded. 39.353, -103.474.

Plant facts

Operator
Limon
Sector
IPP Non-CHP
Grid operator
PSCO
County
Lincoln County, CO
EIA plant ID
59083
Where Colorado's power comes from → Colorado power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
WT1 Onshore Wind Turbine 201 MW 2014 –

Questions

Limon III Wind LLC, answered

How much power does Limon III Wind LLC produce?

Limon III Wind LLC has 201 MW of capacity from one generator. In 2025 it generated 650 GWh, 37% of the most it could have made running flat out all year (its capacity factor).

How many homes does Limon III Wind LLC power?

Its 2025 output of 650 GWh equals the yearly electricity use of about 82,000 average Colorado homes (658 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Limon III Wind LLC?

Limon III Wind LLC is in Lincoln County, Colorado, at about 39.353°, -103.474°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Lincoln County goes 2.8 hours a year without power, the 24th most of 39 counties in Colorado. The county's page has the full outage record.

Who operates Limon III Wind LLC?

It is operated by Limon (EIA sector: IPP Non-CHP), and it feeds Public Service Company of Colorado.

When did Limon III Wind LLC open?

Its oldest generator still running came online in 2014.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Colorado home's 658 kWh a month in 2025. Methodology.