Wind power plant · Lincoln, CO

Limon Wind II

Limon Wind II is a 200 MW wind power plant in Lincoln County, Colorado, operated by Limon. Its oldest generator still running came online in 2012. In 2025 it generated 485 GWh, about what 61,000 average Colorado homes use in a year.

Capacity200 MWNameplate, September 2026
Generated485 GWhIn 2025
Capacity factor28%Share of the most it could make, 2025
Generators1Oldest from 2012

Limon Wind II in context

Among the 34 wind plants in Colorado in the EIA's inventory, it is the 13th largest, about 3.4% of the state's 5.9 GW of wind capacity.

Lincoln County has 5 power plants of 1 MW or more with 1.0 GW in all; Limon Wind II is 20% of that and the 4th largest of 4 wind plants there.

Its capacity factor of 28% in 2025 is lower than the 32% typical for wind plants across the US.

The average electricity customer in Lincoln County goes 2.8 hours a year without power, the 24th most of 39 counties in Colorado. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060080020182019202020212022202320242025GWh 485
02004006008002019202120232025485

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Limon Wind II (outlined) and other plants in Lincoln County, shaded. 39.341, -103.581.

Plant facts

Operator
Limon
Sector
IPP Non-CHP
Grid operator
PSCO
County
Lincoln County, CO
EIA plant ID
58127
Where Colorado's power comes from → Colorado power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Onshore Wind Turbine 200 MW 2012 –

Questions

Limon Wind II, answered

How much power does Limon Wind II produce?

Limon Wind II has 200 MW of capacity from one generator. In 2025 it generated 485 GWh, 28% of the most it could have made running flat out all year (its capacity factor).

How many homes does Limon Wind II power?

Its 2025 output of 485 GWh equals the yearly electricity use of about 61,000 average Colorado homes (658 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Limon Wind II?

Limon Wind II is in Lincoln County, Colorado, at about 39.341°, -103.581°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Lincoln County goes 2.8 hours a year without power, the 24th most of 39 counties in Colorado. The county's page has the full outage record.

Who operates Limon Wind II?

It is operated by Limon (EIA sector: IPP Non-CHP), and it feeds Public Service Company of Colorado.

When did Limon Wind II open?

Its oldest generator still running came online in 2012.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Colorado home's 658 kWh a month in 2025. Methodology.