Solar power plant · Hillsborough, FL

Little Manatee River Solar

Little Manatee River Solar is a 75 MW solar power plant in Hillsborough County, Florida, operated by Tampa Electric Co. Its oldest generator still running came online in 2020. In 2025 it generated 89 GWh, about what 6,700 average Florida homes use in a year.

Capacity75 MWNameplate, September 2026
Generated89 GWhIn 2025
Capacity factor14%Share of the most it could make, 2025
Generators1Oldest from 2020

Little Manatee River Solar in context

Among the 226 solar plants in Florida in the EIA's inventory, it is the 62nd largest, about 0.5% of the state's 14 GW of solar capacity.

Hillsborough County has 25 power plants of 1 MW or more with 5.1 GW in all; Little Manatee River Solar is 1% of that and the 3rd largest of 17 solar plants there.

Its capacity factor of 14% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in Hillsborough County goes 6.6 hours a year without power, the 42nd most of 67 counties in Florida. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

050100150200202020212022202320242025GWh 89
05010015020020202021202220232024202589

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Little Manatee River Solar (outlined) and other plants in Hillsborough County, shaded. 27.691, -82.411.

Plant facts

Operator
Tampa Electric Co
Sector
Electric Utility
Grid operator
TEC
County
Hillsborough County, FL
EIA plant ID
62750
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GEN1 Solar Photovoltaic 75 MW 2020 –

Questions

Little Manatee River Solar, answered

How much power does Little Manatee River Solar produce?

Little Manatee River Solar has 75 MW of capacity from one generator. In 2025 it generated 89 GWh, 14% of the most it could have made running flat out all year (its capacity factor).

How many homes does Little Manatee River Solar power?

Its 2025 output of 89 GWh equals the yearly electricity use of about 6,700 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Little Manatee River Solar?

Little Manatee River Solar is in Hillsborough County, Florida, at about 27.691°, -82.411°. It is one of 25 power plants of 1 MW or more in the county. The average electricity customer in Hillsborough County goes 6.6 hours a year without power, the 42nd most of 67 counties in Florida. The county's page has the full outage record.

Who operates Little Manatee River Solar?

It is operated by Tampa Electric Co (EIA sector: Electric Utility), and it feeds balancing authority TEC.

When did Little Manatee River Solar open?

Its oldest generator still running came online in 2020.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.