Solar power plant · Brazoria, TX

Long Point Solar

Long Point Solar is a 120 MW solar power plant in Brazoria County, Texas, operated by MN8 Energy LLC. Its oldest generator still running came online in 2025. In 2025 it generated 0.4 GWh, about what 30 average Texas homes use in a year.

Capacity120 MWNameplate, September 2026
Generated0.4 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Long Point Solar in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 131st largest, about 0.3% of the state's 37 GW of solar capacity.

Brazoria County has 42 power plants of 1 MW or more with 6.1 GW in all; Long Point Solar is 2% of that and the 4th largest of 6 solar plants there.

The average electricity customer in Brazoria County goes 28 hours a year without power, the 19th most of 240 counties in Texas. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Long Point Solar (outlined) and other plants in Brazoria County, shaded. 29.244, -95.676.

Plant facts

Operator
MN8 Energy LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Brazoria County, TX
EIA plant ID
68998
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GEN1 Solar Photovoltaic 120 MW 2025 –

Questions

Long Point Solar, answered

How much power does Long Point Solar produce?

Long Point Solar has 120 MW of capacity from one generator. In 2025 it generated 0.4 GWh.

How many homes does Long Point Solar power?

Its 2025 output of 0.4 GWh equals the yearly electricity use of about 30 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Long Point Solar?

Long Point Solar is in Brazoria County, Texas, at about 29.244°, -95.676°. It is one of 42 power plants of 1 MW or more in the county. The average electricity customer in Brazoria County goes 28 hours a year without power, the 19th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Long Point Solar?

It is operated by MN8 Energy LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Long Point Solar open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.