Storage power plant · Hidalgo, TX
Lower Rio Energy Storage
Lower Rio Energy Storage is a 60 MW storage power plant in Hidalgo County, Texas, operated by VESI 38 LLC. Its oldest generator still running came online in 2025.
Lower Rio Energy Storage in context
Among the 233 storage plants in Texas in the EIA's inventory, it is the 90th largest, about 0.4% of the state's 16 GW of storage capacity.
Hidalgo County has 30 power plants of 1 MW or more with 3.4 GW in all; Lower Rio Energy Storage is 2% of that and the 6th largest of 16 storage plants there.
The average electricity customer in Hidalgo County goes 4.6 hours a year without power, the 202nd most of 240 counties in Texas. The county's page has the full outage record.
Where it is
Lower Rio Energy Storage (outlined) and other plants in Hidalgo County, shaded. 26.207, -98.059.
Plant facts
- Operator
- VESI 38 LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Hidalgo County, TX
- EIA plant ID
- 68496
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| LOWR1 | Batteries | 60 MW · 120 MWh | 2025 | – |
Questions
Lower Rio Energy Storage, answered
How much can Lower Rio Energy Storage store and deliver?
Lower Rio Energy Storage can deliver up to 60 MW and hold 120 MWh of energy, from one battery or storage system. Its net energy in 2025 was -1.8 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Lower Rio Energy Storage?
Lower Rio Energy Storage is in Hidalgo County, Texas, at about 26.207°, -98.059°. It is one of 30 power plants of 1 MW or more in the county. The average electricity customer in Hidalgo County goes 4.6 hours a year without power, the 202nd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Lower Rio Energy Storage?
It is operated by VESI 38 LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Lower Rio Energy Storage open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.