Natural gas power plant · Butler, OH
Madison
Madison is a 692 MW natural gas power plant in Butler County, Ohio, operated by Duke Energy Indiana, LLC. Its oldest generator still running came online in 2000. In 2025 it generated 682 GWh, about what 65,000 average Ohio homes use in a year.
Madison in context
Among the 48 natural gas plants in Ohio in the EIA's inventory, it is the 13th largest, about 3.5% of the state's 20 GW of natural gas capacity.
Butler County has 8 power plants of 1 MW or more with 2.1 GW in all; Madison is 33% of that and the largest of 6 natural gas plants there.
Its capacity factor of 11% in 2025 is lower than the 23% typical for natural gas plants across the US.
The average electricity customer in Butler County goes 3.5 hours a year without power, the 64th most of 88 counties in Ohio. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Madison (outlined) and other plants in Butler County, shaded. 39.452, -84.465.
Plant facts
- Operator
- Duke Energy Indiana, LLC
- Sector
- Electric Utility
- Grid operator
- PJM
- County
- Butler County, OH
- EIA plant ID
- 55110
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CT1 | Natural Gas Fired Combustion Turbine | 87 MW | 2000 | – |
| CT2 | Natural Gas Fired Combustion Turbine | 87 MW | 2000 | – |
| CT3 | Natural Gas Fired Combustion Turbine | 87 MW | 2000 | – |
| CT4 | Natural Gas Fired Combustion Turbine | 87 MW | 2000 | – |
| CT5 | Natural Gas Fired Combustion Turbine | 87 MW | 2000 | – |
| CT6 | Natural Gas Fired Combustion Turbine | 87 MW | 2000 | – |
| CT7 | Natural Gas Fired Combustion Turbine | 87 MW | 2000 | – |
| CT8 | Natural Gas Fired Combustion Turbine | 87 MW | 2000 | – |
Nearby
Other plants in Butler County
Questions
Madison, answered
How much power does Madison produce?
Madison has 692 MW of capacity from 8 generators. In 2025 it generated 682 GWh, 11% of the most it could have made running flat out all year (its capacity factor).
How many homes does Madison power?
Its 2025 output of 682 GWh equals the yearly electricity use of about 65,000 average Ohio homes (874 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Madison?
Madison is in Butler County, Ohio, at about 39.452°, -84.465°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Butler County goes 3.5 hours a year without power, the 64th most of 88 counties in Ohio. The county's page has the full outage record.
Who operates Madison?
It is operated by Duke Energy Indiana, LLC (EIA sector: Electric Utility), and it feeds PJM Interconnection.
When did Madison open?
Its oldest generator still running came online in 2000.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Ohio home's 874 kWh a month in 2025. Methodology.