Woodsdale is a 572 MW natural gas power plant in Butler County, Ohio, operated by Duke Energy Kentucky Inc. Its oldest generator still running came online in 1992. In 2025 it generated 321 GWh, about what 31,000 average Ohio homes use in a year.
Woodsdale in context
Among the 48 natural gas plants in Ohio in the EIA's inventory, it is the 17th largest, about 2.9% of the state's 20 GW of natural gas capacity.
Butler County has 8 power plants of 1 MW or more with 2.1 GW in all; Woodsdale is 27% of that and the 2nd largest of 6 natural gas plants there.
Its capacity factor of 6% in 2025 is lower than the 23% typical for natural gas plants across the US.
The average electricity customer in Butler County goes 3.5 hours a year without power, the 64th most of 88 counties in Ohio. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Woodsdale (outlined) and other plants in Butler County, shaded. 39.449, -84.461.
Plant facts
- Operator
- Duke Energy Kentucky Inc
- Sector
- Electric Utility
- Grid operator
- PJM
- County
- Butler County, OH
- EIA plant ID
- 7158
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GT2 | Natural Gas Fired Combustion Turbine | 95 MW | 1992 | – |
| GT3 | Natural Gas Fired Combustion Turbine | 95 MW | 1992 | – |
| GT4 | Natural Gas Fired Combustion Turbine | 95 MW | 1992 | – |
| GT5 | Natural Gas Fired Combustion Turbine | 95 MW | 1992 | – |
| GT6 | Natural Gas Fired Combustion Turbine | 95 MW | 1992 | – |
| GT1 | Natural Gas Fired Combustion Turbine | 95 MW | 1993 | – |
Nearby
Other plants in Butler County
Questions
Woodsdale, answered
How much power does Woodsdale produce?
Woodsdale has 572 MW of capacity from 6 generators. In 2025 it generated 321 GWh, 6% of the most it could have made running flat out all year (its capacity factor).
How many homes does Woodsdale power?
Its 2025 output of 321 GWh equals the yearly electricity use of about 31,000 average Ohio homes (874 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Woodsdale?
Woodsdale is in Butler County, Ohio, at about 39.449°, -84.461°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Butler County goes 3.5 hours a year without power, the 64th most of 88 counties in Ohio. The county's page has the full outage record.
Who operates Woodsdale?
It is operated by Duke Energy Kentucky Inc (EIA sector: Electric Utility), and it feeds PJM Interconnection.
When did Woodsdale open?
Its oldest generator still running came online in 1992.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Ohio home's 874 kWh a month in 2025. Methodology.