Maple Ridge Wind Farm is a 321 MW wind power plant in Lewis County, New York, operated by Flat Rock Windpower, LLC. Its oldest generator still running came online in 2005. In 2025 it generated 698 GWh, about what 99,000 average New York homes use in a year.
Maple Ridge Wind Farm in context
Among the 34 wind plants in New York in the EIA's inventory, it is the largest, about 11% of the state's 3.0 GW of wind capacity.
Lewis County has 29 power plants of 1 MW or more with 785 MW in all; Maple Ridge Wind Farm is 41% of that and the largest of 4 wind plants there.
Its capacity factor of 25% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Lewis County goes 9.4 hours a year without power, the 21st most of 62 counties in New York. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Maple Ridge Wind Farm (outlined) and other plants in Lewis County, shaded. 43.785, -75.575.
Plant facts
- Operator
- Flat Rock Windpower, LLC
- Sector
- IPP Non-CHP
- Grid operator
- NYIS
- County
- Lewis County, NY
- EIA plant ID
- 56290
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 137 MW | 2005 | – |
| 3 | Onshore Wind Turbine | 90 MW | 2006 | – |
| 1A | Onshore Wind Turbine | 61 MW | 2006 | – |
| 2 | Onshore Wind Turbine | 33 MW | 2006 | – |
Nearby
Other plants in Lewis County
Questions
Maple Ridge Wind Farm, answered
How much power does Maple Ridge Wind Farm produce?
Maple Ridge Wind Farm has 321 MW of capacity from 4 generators. In 2025 it generated 698 GWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does Maple Ridge Wind Farm power?
Its 2025 output of 698 GWh equals the yearly electricity use of about 99,000 average New York homes (586 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Maple Ridge Wind Farm?
Maple Ridge Wind Farm is in Lewis County, New York, at about 43.785°, -75.575°. It is one of 29 power plants of 1 MW or more in the county. The average electricity customer in Lewis County goes 9.4 hours a year without power, the 21st most of 62 counties in New York. The county's page has the full outage record.
Who operates Maple Ridge Wind Farm?
It is operated by Flat Rock Windpower, LLC (EIA sector: IPP Non-CHP), and it feeds the New York ISO.
When did Maple Ridge Wind Farm open?
Its oldest generator still running came online in 2005.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average New York home's 586 kWh a month in 2025. Methodology.