Wind power plant · Lewis, NY
Number Three Wind Project
Number Three Wind Project is a 106 MW wind power plant in Lewis County, New York, operated by Invenergy Services LLC. Its oldest generator still running came online in 2023. In 2025 it generated 295 GWh, about what 42,000 average New York homes use in a year.
Number Three Wind Project in context
Among the 34 wind plants in New York in the EIA's inventory, it is the 12th largest, about 3.6% of the state's 3.0 GW of wind capacity.
Lewis County has 29 power plants of 1 MW or more with 785 MW in all; Number Three Wind Project is 13% of that and the 2nd largest of 4 wind plants there.
Its capacity factor of 32% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Lewis County goes 9.4 hours a year without power, the 21st most of 62 counties in New York. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Number Three Wind Project (outlined) and other plants in Lewis County, shaded. 43.840, -75.570.
Plant facts
- Operator
- Invenergy Services LLC
- Sector
- IPP Non-CHP
- Grid operator
- NYIS
- County
- Lewis County, NY
- EIA plant ID
- 65522
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 65013 | Onshore Wind Turbine | 106 MW | 2023 | – |
Nearby
Other plants in Lewis County
Questions
Number Three Wind Project, answered
How much power does Number Three Wind Project produce?
Number Three Wind Project has 106 MW of capacity from one generator. In 2025 it generated 295 GWh, 32% of the most it could have made running flat out all year (its capacity factor).
How many homes does Number Three Wind Project power?
Its 2025 output of 295 GWh equals the yearly electricity use of about 42,000 average New York homes (586 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Number Three Wind Project?
Number Three Wind Project is in Lewis County, New York, at about 43.840°, -75.570°. It is one of 29 power plants of 1 MW or more in the county. The average electricity customer in Lewis County goes 9.4 hours a year without power, the 21st most of 62 counties in New York. The county's page has the full outage record.
Who operates Number Three Wind Project?
It is operated by Invenergy Services LLC (EIA sector: IPP Non-CHP), and it feeds the New York ISO.
When did Number Three Wind Project open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average New York home's 586 kWh a month in 2025. Methodology.