Other power plant · Polk, FL

Mosaic South Pierce Operations

Mosaic South Pierce Operations is a 38 MW other power plant in Polk County, Florida, operated by Mosaic Fertilizer LLC. Its oldest generator still running came online in 1992. In 2025 it generated 88 GWh, about what 6,600 average Florida homes use in a year.

Capacity38 MWNameplate, September 2026
Generated88 GWhIn 2025
Capacity factor26%Share of the most it could make, 2025
Generators1Oldest from 1992

Mosaic South Pierce Operations in context

Among the 40 other-fuel plants in Florida in the EIA's inventory, it is the 22nd largest, about 1.4% of the state's 2.6 GW of other-fuel capacity.

Polk County has 29 power plants of 1 MW or more with 6.7 GW in all; Mosaic South Pierce Operations is 1% of that and the 4th largest of 4 other plants there.

Its capacity factor of 26% in 2025 is close to the 25% typical for other plants across the US.

The average electricity customer in Polk County goes 9.9 hours a year without power, the 33rd most of 67 counties in Florida. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030020182019202020212022202320242025GWh 88
0100200300201920212023202588

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Mosaic South Pierce Operations (outlined) and other plants in Polk County, shaded. 27.765, -81.939.

Plant facts

Operator
Mosaic Fertilizer LLC
Sector
Industrial CHP
Grid operator
TEC
County
Polk County, FL
EIA plant ID
10004
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
TG2 All Other 38 MW 1992 –

Retired

GeneratorTechnologyCapacityOnlineRetired
TG1All Other7.5 MW19782025

Questions

Mosaic South Pierce Operations, answered

How much power does Mosaic South Pierce Operations produce?

Mosaic South Pierce Operations has 38 MW of capacity from one generator. In 2025 it generated 88 GWh, 26% of the most it could have made running flat out all year (its capacity factor).

How many homes does Mosaic South Pierce Operations power?

Its 2025 output of 88 GWh equals the yearly electricity use of about 6,600 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Mosaic South Pierce Operations?

Mosaic South Pierce Operations is in Polk County, Florida, at about 27.765°, -81.939°. It is one of 29 power plants of 1 MW or more in the county. The average electricity customer in Polk County goes 9.9 hours a year without power, the 33rd most of 67 counties in Florida. The county's page has the full outage record.

Who operates Mosaic South Pierce Operations?

It is operated by Mosaic Fertilizer LLC (EIA sector: Industrial CHP), and it feeds balancing authority TEC.

When did Mosaic South Pierce Operations open?

Its oldest generator still running came online in 1992.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.