Solar power plant · Clark, NV

Nellis Solar PV II

Nellis Solar PV II is a 15 MW solar power plant in Clark County, Nevada, operated by Nevada Power Co. Its oldest generator still running came online in 2015. In 2025 it generated 5.8 GWh, about what 557 average Nevada homes use in a year.

Capacity15 MWNameplate, September 2026
Generated5.8 GWhIn 2025
Capacity factor4%Share of the most it could make, 2025
Generators1Oldest from 2015

Nellis Solar PV II in context

Among the 58 solar plants in Nevada in the EIA's inventory, it is the 41st largest, about 0.2% of the state's 6.2 GW of solar capacity.

Clark County has 64 power plants of 1 MW or more with 14 GW in all; Nellis Solar PV II is 0% of that and the 31st largest of 45 solar plants there.

Its capacity factor of 4% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0102030405020182019202020212022202320242025GWh 6
0102030405020192021202320256

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Nellis Solar PV II (outlined) and other plants in Clark County, shaded. 36.207, -115.048.

Plant facts

Operator
Nevada Power Co
Sector
Electric Utility
Grid operator
NEVP
County
Clark County, NV
EIA plant ID
59919
Where Nevada's power comes from → Nevada power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
NSPV2 Solar Photovoltaic 15 MW 2015 –

Questions

Nellis Solar PV II, answered

How much power does Nellis Solar PV II produce?

Nellis Solar PV II has 15 MW of capacity from one generator. In 2025 it generated 5.8 GWh, 4% of the most it could have made running flat out all year (its capacity factor).

How many homes does Nellis Solar PV II power?

Its 2025 output of 5.8 GWh equals the yearly electricity use of about 557 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Nellis Solar PV II?

Nellis Solar PV II is in Clark County, Nevada, at about 36.207°, -115.048°. It is one of 64 power plants of 1 MW or more in the county. The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.

Who operates Nellis Solar PV II?

It is operated by Nevada Power Co (EIA sector: Electric Utility), and it feeds NV Energy.

When did Nellis Solar PV II open?

Its oldest generator still running came online in 2015.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Nevada home's 868 kWh a month in 2025. Methodology.