Wind power plant · Ector, TX
Notrees Windpower Hybrid
Notrees Windpower Hybrid is a 189 MW wind power plant in Ector County, Texas, operated by Deriva Energy. Its oldest generator still running came online in 2009. In 2025 it generated 237 GWh, about what 18,000 average Texas homes use in a year.
Notrees Windpower Hybrid in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 115th largest, about 0.4% of the state's 45 GW of wind capacity.
Ector County has 21 power plants of 1 MW or more with 3.3 GW in all; Notrees Windpower Hybrid is 6% of that.
Its capacity factor of 14% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Ector County goes 2.6 hours a year without power, the 226th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Notrees Windpower Hybrid (outlined) and other plants in Ector County, shaded. 31.995, -102.828.
Plant facts
- Operator
- Deriva Energy
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Ector County, TX
- EIA plant ID
- 56961
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| VESTA | Onshore Wind Turbine | 93 MW | 2009 | – |
| GE | Onshore Wind Turbine | 60 MW | 2009 | – |
| BATT | Batteries | 36 MW · 14 MWh | 2012 | – |
Questions
Notrees Windpower Hybrid, answered
How much power does Notrees Windpower Hybrid produce?
Notrees Windpower Hybrid has 189 MW of capacity from 3 generators. In 2025 it generated 237 GWh, 14% of the most it could have made running flat out all year (its capacity factor).
How many homes does Notrees Windpower Hybrid power?
Its 2025 output of 237 GWh equals the yearly electricity use of about 18,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Notrees Windpower Hybrid?
Notrees Windpower Hybrid is in Ector County, Texas, at about 31.995°, -102.828°. It is one of 21 power plants of 1 MW or more in the county. The average electricity customer in Ector County goes 2.6 hours a year without power, the 226th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Notrees Windpower Hybrid?
It is operated by Deriva Energy (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Notrees Windpower Hybrid open?
Its oldest generator still running came online in 2009.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.