Solar power plant · Ector, TX
Swift Air Solar I
Swift Air Solar I is a 145 MW solar power plant in Ector County, Texas, operated by Origis Energy USA, Inc. Its oldest generator still running came online in 2025. In 2025 it generated 312 GWh, about what 23,000 average Texas homes use in a year.
Swift Air Solar I in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 118th largest, about 0.4% of the state's 37 GW of solar capacity.
Ector County has 21 power plants of 1 MW or more with 3.3 GW in all; Swift Air Solar I is 4% of that and the 4th largest of 9 solar plants there.
The average electricity customer in Ector County goes 2.6 hours a year without power, the 226th most of 240 counties in Texas. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Swift Air Solar I (outlined) and other plants in Ector County, shaded. 31.769, -102.696.
Plant facts
- Operator
- Origis Energy USA, Inc
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Ector County, TX
- EIA plant ID
- 68537
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| OSAS1 | Solar Photovoltaic | 145 MW | 2025 | – |
Questions
Swift Air Solar I, answered
How much power does Swift Air Solar I produce?
Swift Air Solar I has 145 MW of capacity from one generator. In 2025 it generated 312 GWh.
How many homes does Swift Air Solar I power?
Its 2025 output of 312 GWh equals the yearly electricity use of about 23,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Swift Air Solar I?
Swift Air Solar I is in Ector County, Texas, at about 31.769°, -102.696°. It is one of 21 power plants of 1 MW or more in the county. The average electricity customer in Ector County goes 2.6 hours a year without power, the 226th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Swift Air Solar I?
It is operated by Origis Energy USA, Inc (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Swift Air Solar I open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.