Solar power plant · Ector, TX

Swift Air Solar III

Swift Air Solar III is a 100 MW solar power plant in Ector County, Texas, operated by Origis Energy USA, Inc. Its oldest generator still running came online in 2025. In 2025 it generated 21 GWh, about what 1,600 average Texas homes use in a year.

Capacity100 MWNameplate, September 2026
Generated21 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Swift Air Solar III in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 149th largest, about 0.3% of the state's 37 GW of solar capacity.

Ector County has 21 power plants of 1 MW or more with 3.3 GW in all; Swift Air Solar III is 3% of that and the 5th largest of 9 solar plants there.

The average electricity customer in Ector County goes 2.6 hours a year without power, the 226th most of 240 counties in Texas. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Swift Air Solar III (outlined) and other plants in Ector County, shaded. 31.723, -102.520.

Plant facts

Operator
Origis Energy USA, Inc
Sector
IPP Non-CHP
Grid operator
ERCO
County
Ector County, TX
EIA plant ID
68588
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
OSAS3 Solar Photovoltaic 100 MW 2025 –

Questions

Swift Air Solar III, answered

How much power does Swift Air Solar III produce?

Swift Air Solar III has 100 MW of capacity from one generator. In 2025 it generated 21 GWh.

How many homes does Swift Air Solar III power?

Its 2025 output of 21 GWh equals the yearly electricity use of about 1,600 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Swift Air Solar III?

Swift Air Solar III is in Ector County, Texas, at about 31.723°, -102.520°. It is one of 21 power plants of 1 MW or more in the county. The average electricity customer in Ector County goes 2.6 hours a year without power, the 226th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Swift Air Solar III?

It is operated by Origis Energy USA, Inc (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Swift Air Solar III open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.