Solar power plant · Ector, TX
Oberon IB
Oberon IB is a 30 MW solar power plant in Ector County, Texas, operated by Oberon Solar IB. Its oldest generator still running came online in 2020. In 2025 it generated 62 GWh, about what 4,600 average Texas homes use in a year.
Oberon IB in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 174th largest, about 0.1% of the state's 37 GW of solar capacity.
Ector County has 21 power plants of 1 MW or more with 3.3 GW in all; Oberon IB is 1% of that and the 7th largest of 9 solar plants there.
Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Ector County goes 2.6 hours a year without power, the 226th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Oberon IB (outlined) and other plants in Ector County, shaded. 31.692, -102.697.
Plant facts
- Operator
- Oberon Solar IB
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Ector County, TX
- EIA plant ID
- 62932
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| OBR1B | Solar Photovoltaic | 30 MW | 2020 | – |
Questions
Oberon IB, answered
How much power does Oberon IB produce?
Oberon IB has 30 MW of capacity from one generator. In 2025 it generated 62 GWh, 24% of the most it could have made running flat out all year (its capacity factor).
How many homes does Oberon IB power?
Its 2025 output of 62 GWh equals the yearly electricity use of about 4,600 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Oberon IB?
Oberon IB is in Ector County, Texas, at about 31.692°, -102.697°. It is one of 21 power plants of 1 MW or more in the county. The average electricity customer in Ector County goes 2.6 hours a year without power, the 226th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Oberon IB?
It is operated by Oberon Solar IB (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Oberon IB open?
Its oldest generator still running came online in 2020.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.