Natural gas power plant · Brevard, FL
Oleander Power Project LP
Oleander Power Project LP is a 994 MW natural gas power plant in Brevard County, Florida, operated by Oleander Holdings LLC . Its oldest generator still running came online in 2002. In 2025 it generated 580 GWh, about what 44,000 average Florida homes use in a year.
Oleander Power Project LP in context
Among the 68 natural gas plants in Florida in the EIA's inventory, it is the 22nd largest, about 1.8% of the state's 56 GW of natural gas capacity.
Brevard County has 12 power plants of 1 MW or more with 3.7 GW in all; Oleander Power Project LP is 27% of that and the 2nd largest of 4 natural gas plants there.
Its capacity factor of 7% in 2025 is lower than the 23% typical for natural gas plants across the US.
The average electricity customer in Brevard County goes 4.7 hours a year without power, the 51st most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Oleander Power Project LP (outlined) and other plants in Brevard County, shaded. 28.366, -80.795.
Plant facts
- Operator
- Oleander Holdings LLC
- Sector
- IPP Non-CHP
- Grid operator
- FPL
- County
- Brevard County, FL
- EIA plant ID
- 55286
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| OG1 | Natural Gas Fired Combustion Turbine | 199 MW | 2002 | – |
| OG2 | Natural Gas Fired Combustion Turbine | 199 MW | 2002 | – |
| OG3 | Natural Gas Fired Combustion Turbine | 199 MW | 2002 | – |
| OG4 | Natural Gas Fired Combustion Turbine | 199 MW | 2002 | – |
| OG5 | Natural Gas Fired Combustion Turbine | 199 MW | 2007 | – |
Questions
Oleander Power Project LP, answered
How much power does Oleander Power Project LP produce?
Oleander Power Project LP has 994 MW of capacity from 5 generators. In 2025 it generated 580 GWh, 7% of the most it could have made running flat out all year (its capacity factor).
How many homes does Oleander Power Project LP power?
Its 2025 output of 580 GWh equals the yearly electricity use of about 44,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Oleander Power Project LP?
Oleander Power Project LP is in Brevard County, Florida, at about 28.366°, -80.795°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Brevard County goes 4.7 hours a year without power, the 51st most of 67 counties in Florida. The county's page has the full outage record.
Who operates Oleander Power Project LP?
It is operated by Oleander Holdings LLC (EIA sector: IPP Non-CHP), and it feeds Florida Power & Light.
When did Oleander Power Project LP open?
Its oldest generator still running came online in 2002.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.