Oil power plant · Huron, MI

Oliver

Oliver is a 14 MW oil power plant in Huron County, Michigan, operated by DTE Electric Company. Its oldest generator still running came online in 1970.

Capacity14 MWNameplate, September 2026
Generated-0.3 GWhIn 2025
Capacity factor–Not a full year of data
Generators5Oldest from 1970

Oliver in context

Among the 57 other-fuel plants in Michigan in the EIA's inventory, it is the 17th largest, about 1.5% of the state's 873 MW of other-fuel capacity.

Huron County has 18 power plants of 1 MW or more with 1.0 GW in all; Oliver is 1% of that and the largest of 3 oil plants there.

The average electricity customer in Huron County goes 36 hours a year without power, the 6th most of 83 counties in Michigan. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

000111120182019202020212022202320242025GWh -0
00011112019202120232025-0

Where it is

Oliver (outlined) and other plants in Huron County, shaded. 43.826, -83.238.

Plant facts

Operator
DTE Electric Company
Sector
Electric Utility
Grid operator
MISO
County
Huron County, MI
EIA plant ID
1735
Where Michigan's power comes from → Michigan power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Petroleum Liquids 2.7 MW 1970 –
2 Petroleum Liquids 2.7 MW 1970 –
3 Petroleum Liquids 2.7 MW 1970 –
4 Petroleum Liquids 2.7 MW 1970 –
5 Petroleum Liquids 2.7 MW 1970 –

Questions

Oliver, answered

How much power does Oliver produce?

Oliver has 14 MW of capacity from 5 generators. No full year of generation is reported yet.

Where is Oliver?

Oliver is in Huron County, Michigan, at about 43.826°, -83.238°. It is one of 18 power plants of 1 MW or more in the county. The average electricity customer in Huron County goes 36 hours a year without power, the 6th most of 83 counties in Michigan. The county's page has the full outage record.

Who operates Oliver?

It is operated by DTE Electric Company (EIA sector: Electric Utility), and it feeds MISO.

When did Oliver open?

Its oldest generator still running came online in 1970.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Methodology.