Solar power plant · Clark, NV

Playa Solar 1, LLC

Playa Solar 1, LLC is a 79 MW solar power plant in Clark County, Nevada, operated by EDF Renewable Asset Holdings, Inc.. Its oldest generator still running came online in 2017. In 2025 it generated 183 GWh, about what 18,000 average Nevada homes use in a year.

Capacity79 MWNameplate, September 2026
Generated183 GWhIn 2025
Capacity factor27%Share of the most it could make, 2025
Generators1Oldest from 2017

Playa Solar 1, LLC in context

Among the 58 solar plants in Nevada in the EIA's inventory, it is the 25th largest, about 1.3% of the state's 6.2 GW of solar capacity.

Clark County has 64 power plants of 1 MW or more with 14 GW in all; Playa Solar 1, LLC is 1% of that and the 19th largest of 45 solar plants there.

Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020025020182019202020212022202320242025GWh 183
0501001502002502019202120232025183

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Playa Solar 1, LLC (outlined) and other plants in Clark County, shaded. 36.408, -114.908.

Plant facts

Operator
EDF Renewable Asset Holdings, Inc.
Sector
IPP Non-CHP
Grid operator
NEVP
County
Clark County, NV
EIA plant ID
59827
Where Nevada's power comes from → Nevada power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GEN01 Solar Photovoltaic 79 MW 2017 –

Questions

Playa Solar 1, LLC, answered

How much power does Playa Solar 1, LLC produce?

Playa Solar 1, LLC has 79 MW of capacity from one generator. In 2025 it generated 183 GWh, 27% of the most it could have made running flat out all year (its capacity factor).

How many homes does Playa Solar 1, LLC power?

Its 2025 output of 183 GWh equals the yearly electricity use of about 18,000 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Playa Solar 1, LLC?

Playa Solar 1, LLC is in Clark County, Nevada, at about 36.408°, -114.908°. It is one of 64 power plants of 1 MW or more in the county. The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.

Who operates Playa Solar 1, LLC?

It is operated by EDF Renewable Asset Holdings, Inc. (EIA sector: IPP Non-CHP), and it feeds NV Energy.

When did Playa Solar 1, LLC open?

Its oldest generator still running came online in 2017.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Nevada home's 868 kWh a month in 2025. Methodology.